City Construction Projects
220 W 14th ST
- Case Date:
- 9/10/2024
Sidewalk closed sign laying in the tree plot. There's no construction going on around here, so I am not sure how or why it's here. Just thought I would let you know in case you are missing one.
City Construction Projects
401 N Morton ST
- Case Date:
- 8/28/2024
What is happening again on Clarizz street. How much money and time has the city wasted on what ever project this is. Surely we have better uses for our resources. Connie Clark
City Construction Projects
613 E 12th ST
- Case Date:
- 8/18/2024
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
City Construction Projects
500 W 7th ST
- Case Date:
- 2/12/2024
Why there detour sign on seventh street
City Construction Projects
2711 N Dunn ST
- Case Date:
- 4/13/2023
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 4/11/2023
City and/or Utility contractors (Duke, Meridiam, etc.) have been leaving signage scattered about the neighborhood. Currently, there is the following:
1) Tall, metal support at SW corner of Cottage Grove and Grant (322 E. Grant), 2) Identical metal support on south retaining wall of 414 E. Cottage Grove, 3) Pile of signage and sandbags on NE corner of 325 E. 10th Street, 4) Pile of signs in west yard of 418 N. Grant, 5) Bag of construction waste (NaOH ?) sitting on east side of Lincoln near 518 N. Lincoln.
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 3/30/2023
Duke Energy contractors (B&B ?) are leaving signage scattered around. There is a pile of orange-stripped wood signs and associated sandbags lying on the alley on the west side of Grant between 10th and Cottage Grove, and also there are two large, metal sign supports lying at the SW and NW corners of the intersection of CG and Grant.
City Construction Projects
326 W 17th ST
- Case Date:
- 1/11/2023
This sidewalk has been broken for FOR OVER 2 YEARS! And it has been reported before. It's been broken for so long you can see the damage on the satellite image you're using lmao. Pretty bad. Not just is the corner broken up into large chunks but going down the sidewalk east on 17th, the sidewalk has been worn down for years as well with no repair. One is walking on sharp pebbles instead of smooth sidewalk. Not sure what it takes for you all to actually give a shit and do something about it. But, y'know, it would be pretty cool if you did.
City Construction Projects
709 N Keystone CT
- Case Date:
- 11/30/2022
please add a traffic signal here this can be a dangerous intersection. a traffic signal here will aid the city bus (route 6 and 6L) in making its runs and traffic flow for cars, bikes and pedestrian's.
City Construction Projects
320 W 8th ST
- Case Date:
- 1/15/2020
7th and Union badly needs crosswalk for pedestrian and bike. Thank you!