uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (79)

closed #121344

City Construction Projects

1105 S Rogers ST

Case Date:
5/15/1996

recent cut--cut repair is very rough and deteriorating

closed #41837

City Construction Projects

1103 N Woodburn AVE

Case Date:
1/22/2003

Letter stated Mr. Schatz feels that a crack (leak) in his pvc pipe connector to meter was caused by damage during construction. Customer had break repaired but received extra large water bill. Wants matter investigated and adjustment made.

closed #103141

City Construction Projects

1101 N COLLEGE ST

Case Date:
6/20/2003

Line torn out by contractor with backhoe.

closed #107789

City Construction Projects

110 S Clark ST

Case Date:
9/19/2001

Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?

closed #71125

City Construction Projects

101 S Smith RD

Case Date:
5/28/1996

AT THE CORNER OF MORNINGSIDE DRIVE & SMITH ROAD. THE CITY FINISHED THEIR PROJECT OUT THERE ABOUT A YEAR AGO THERE IS A SMALL PLOT OF LAND AT THIS INTERSECTION THAT HAD SOD PUT DOWN. THE GRASS DIED AND MR. BROTHERS WOULD LIKE FOR THE CITY TO REPLACE THIS PORTION. THIS AREA IS IN THE CITY RIGHT OF WAY. JANE FLEIG DID GO OUT TO TAKE A LOOK AT SITE ON 5/28/96.

closed #54387

City Construction Projects

100 E 6th ST

Case Date:
4/7/2000

due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.

closed #125024

City Construction Projects

Case Date:
2/7/2012

Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east

closed #125721

City Construction Projects

Case Date:
4/13/2012

Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction? Thanks, Gerry Matthews

closed #178421

City Construction Projects

Case Date:
12/14/2021

Mike Morris (917-538-5927) called about a tree that fell on the multi-use path handrail on Rogers, just east of High. He mentioned it happened months ago and wanted to know when it will be repaired.