closed #73854

City Construction Projects

806 W 4th ST

Case Date:
6/20/2011

The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.

closed #119377

City Construction Projects

615 N Adams ST

Case Date:
5/15/1997

8TH & ADAMS STREET REDEVELOPMENT PROJECT: HALL STATES THAT THE SIDEWALK IS SPALDING VERY BADLY. HE WOULD LIKE TO HAVE SOMEONE FROM THE CITY COME AND WALK THE SITE WITH HIM. HALL STATES THAT THIS IS "THE WORST JOB HE HAS EVER SEEN".

closed #67178

City Construction Projects

501 E 7th ST

Case Date:
7/14/1997

Trash, concrete, etc., left on sidewalks from remodeling and curb cut. Vehicles are parked on sidewalks.

closed #116841

City Construction Projects

423 E Kirkwood AVE

Case Date:
7/2/1998

Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.

closed #116842

City Construction Projects

423 E Kirkwood AVE

Case Date:
7/2/1998

Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.

closed #53758

City Construction Projects

420 E Kirkwood AVE

Case Date:
6/13/2000

Mr. Koontz called T&D and said that his wife was driving on the alleys at 420 E. Kirkwood (behind McDonalds's) and did a lot of damage to her car.

closed #66048

City Construction Projects

401 N Morton ST

Case Date:
10/23/1997

Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?

closed #96393

City Construction Projects

401 N Morton ST

Case Date:
5/25/2005

citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".

closed #121146

City Construction Projects

401 N Morton ST

Case Date:
8/12/1996

Says promised traffic calming devices have not been installed. Were told they'd go in right away (6th St). Says City Landscaper told him no one discussed watering of greenery with him. Says City departments aren't coordinating and work isn't getting done.

closed #121156

City Construction Projects

401 N Morton ST

Case Date:
8/9/1996

Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.