closed #175848
City Construction Projects
317 E Allen ST
- Case Date:
- 5/19/2021
The bolts sticking out of the speed bump are a hazard.
The bolts sticking out of the speed bump are a hazard.
She called to lodge a complaint about the speed humps that have been installed on Morningside Drive. She lives in Park Ridge east and can't "catch the light" at Smith and 3rd and can't use 10th Street because of the "awful bicycles". She says we have just created "one large driveway " for the people who live on Morningside.
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed. See letter
The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.
Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?