uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (280)

closed #60148

City Construction Projects

925 S Ballantine RD

Case Date:
10/22/1998

The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.

closed #174341

City Construction Projects

939 S High ST

Case Date:
12/15/2020

Tree limbs growing into and touching public utility lines. Several trees have not been pruned.

closed #173094

City Construction Projects

Bloomington City Hall

Case Date:
7/19/2020

Continual speeders on E Morningside. Someone told me our neighborhood association requested traffic calming. Please do something to keep it from being a drag strip. Definitely open to whatever you think best but multiple of us have complained for some time without changes. Thank you for your good work.

closed #187440

City Construction Projects

Bloomington City Hall, 401 N Morton St, Bloomington, IN 47401, USA

Case Date:
2/27/2024

At the corner of 3rd and Clarizz. Sitting at the light heading west and turning south onto Clarizz the concrete barrier sticks out in a manner that is not very visible at night. I blew a tire hitting the concrete bicycle median. I hope this makes sense. Than you.

closed #187372

City Construction Projects

Bloomington Hospital Heliport, 2651 E Discovery Pkwy, Bloomington, IN 47408, USA

Case Date:
2/19/2024

Why there road work at new hospital

closed #174276

City Construction Projects

Bloomington, IN 47404, USA

Case Date:
12/5/2020

On the lookout deck by the parking lot, there is a missing grate, so there is a leg-sized hole in the concrete. There is also a lot of broken class on the ground at the end of the lookout deck.

closed #170868

City Construction Projects

Bloomington, Indiana

Case Date:
11/2/2019

Olcott park pathway to Jackson Creek middle school parking lot. When the temperature drops below freezing, this becomes a sheet of ice due to some drainage from the football field flowing down the paved path. Dozens of school children use the path to get to and from school as well as community members. It has been a high slip risk For the last few years as this path does not receive ice removal or salting on a regular basis. Instead of trying to keep up with salting or removing the ice on this long path I hope the city could look into rerouting the source of the drainage to not flow on the pedestrian path.

closed #167192

City Construction Projects

Chase

Case Date:
1/24/2019

Large pothole on 2nd where BLine crosses going east

closed #182259

City Construction Projects

E 19th St, Bloomington, IN, USA

Case Date:
12/12/2022

The apartment construction by Varsity properties on East 19th Street has caused an excessive level of dust on the road. Whenever a vehicle drives by, the dust becomes airborne. In addition, the dust also falls on to nearby vehicles, causing a significant amount of scratches and inconvenience. No effort has been made to clean up the street. It is especially disgusting to walk on when it rains.

closed #182217

City Construction Projects

E 3rd St, Bloomington, IN, USA

Case Date:
12/6/2022

There is an unsecured steel road plate covering up a pot hole, it is not secure and dangerous. It also makes a loud, echoing noise all day and night and residents in neighboring apartment buildings hear the banging all day and all night long. It needs to be secured or the pothole or road issue needs to be fixed. It's been like this for about 10 days.