closed #151354
City Construction Projects
Indiana University, Bloomington
- Case Date:
- 4/4/2016
Road closed signs are knocked over and are in the southbound lane of Woodlawn.
Road closed signs are knocked over and are in the southbound lane of Woodlawn.
Subsidence of manhole cover. (Water) I have seen no less than 3 people stumble due to 1/2" drop. Maybe bevel edge of brick.
For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.
I've lived in this neighborhood for over 20 years, and the city put a hazard sign on the sidewalk months/years ago, but nothing else has been done to correct the problem, which can be quite dangerous at night
STREET CAVING IN WHERE WORK WAS DONE
STREET CAVING IN WHERE WORK WAS DONE
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
Rockport between 37 and Country Club has become very hazardous during the detour. Tapp Rd construction has taken far too long for the size of the project. Its not a long section of road. why hasn't this project been finished and reopened? If there's a valid problem, city or county should monitor the traffic.
New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.