City Construction Projects
1604 S Rogers ST
- Case Date:
- 4/7/1997
A CONCERNED CITIZEN CAME INTO THE ENGINEERING DEPARTMENT REGARDING THE CULVERT PIPE INSTALLED ON SOUTH ROGERS STREET ( A FEW YARDS NORTH OF #1604) AT THE RAILROAD TRACKS. THE GROUND/ROAD ON THE SOUTHEAST CORNER IS ERODING AWAY CAUSING A STEEP DROP OFF. REYNOLDS COMPANY DID A ROAD PROJECT AT THIS AREA APPROXIMATELY LAST YEAR OR THE YEAR BEFORE. THE CITIZEN IS CONCERNED THAT THE ROAD WILL CONTINUE TO ERODE AWAY, COULD SOMEONE FROM THE ENGINEERING DEPARTMENT TAKE A LOOK AT THE PIPE.
City Construction Projects
1525 E Bradshire ST
- Case Date:
- 3/29/2020
Loose wire on power line.
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance
City Construction Projects
1427 W Allen ST
- Case Date:
- 1/1/2022
Please have public streetlights installed at the entrance of Whittington Commons on Allen Street. It is very dark, and it is difficult to see entrance. I know this is a private road within WC, but Allen is a public street and it is a hazard to not have streetlights at entrance given the public sidewalk crosses the entrance. Light it up!
City Construction Projects
1416 S Liberty DR
- Case Date:
- 4/27/2024
What are all the barricades for along Liberty Drive? The start from Highway 45 and go quite a ways…
City Construction Projects
1409 S Madison ST
- Case Date:
- 7/24/1996
1200-1300 S.MADISON (FROM GRIMES TO HILLSIDE) REYNOLDS CONSTRUCTION DOING
WORK FOR UTILITIES DEPT. EXCESS DIRT/SAND NEEDS TO BE SWEPT UP.
City Construction Projects
1398 W 8th ST
- Case Date:
- 9/5/2020
Huge hole in the road on the corner of 8th and Fountain.
City Construction Projects
1375 W Allen ST
- Case Date:
- 7/11/2018
A tree fell on power lines next to Willows Apartments. It must've happened during the last storm. It's been several days and no one has done anything, so I wanted to make sure the City knew about it. Potentially hazardous, also blocks sight when pulling out of the Willows Apartments.
City Construction Projects
1333 N Washington ST
- Case Date:
- 8/27/2025
Construction is very loud. It starts at 6:30am and even 6am making it very hard to sleep. There are lots of diggers, and drills which are very loud and even making the house rumble. All the residents in my block face this issue.
City Construction Projects
1326 S Dunn ST
- Case Date:
- 11/12/2024
The crews installing fiber have left multiple construction signs in this general vicinity from Dunn heading to the west at least one block- they have been abandoned for over a month