City Construction Projects
110 S Clark ST
- Case Date:
- 9/19/2001
Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?
City Construction Projects
420 E Kirkwood AVE
- Case Date:
- 6/13/2000
Mr. Koontz called T&D and said that his wife was driving on the alleys at 420 E. Kirkwood (behind McDonalds's) and did a lot of damage to her car.
City Construction Projects
2202 S Rockport RD
- Case Date:
- 4/18/2000
There is currently straw around the drainage ditch in front of 2202 S. Rockport. There is not any grass growing, it is all mud filled. There is now a cement stone on the property, left from the construction, and the complaintant can not mow around it. Please call Ms. Smith with any updates on the situation.
City Construction Projects
100 E 6th ST
- Case Date:
- 4/7/2000
due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.
City Construction Projects
1809 E Southdowns DR
- Case Date:
- 10/4/1999
STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
1150 S Clarizz BLVD
- Case Date:
- 2/9/1999
Clarizz Boulevard gate open despite local plan for site that requires it to be closed until mid April. Please take legal action.
City Construction Projects
2100 S Bent Tree DR
- Case Date:
- 2/3/1999
Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.
City Construction Projects
925 S Ballantine RD
- Case Date:
- 10/22/1998
The residents at 925 S. Ballantine had a contractor make a street cut across Ballantine. The cut is sinking in and has become dangerous.
City Construction Projects
2610 S Rockport RD
- Case Date:
- 8/31/1998
Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.