City Construction Projects
- Case Date:
- 12/22/2022
The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.
City Construction Projects
326 W 17th ST
- Case Date:
- 1/11/2023
This sidewalk has been broken for FOR OVER 2 YEARS! And it has been reported before. It's been broken for so long you can see the damage on the satellite image you're using lmao. Pretty bad. Not just is the corner broken up into large chunks but going down the sidewalk east on 17th, the sidewalk has been worn down for years as well with no repair. One is walking on sharp pebbles instead of smooth sidewalk. Not sure what it takes for you all to actually give a shit and do something about it. But, y'know, it would be pretty cool if you did.
City Construction Projects
301 E 19th ST
- Case Date:
- 1/16/2023
Whenever I return home from work every night, I am always greeted by the mud from construction. Someone else has reported this issue December last year, but I don’t see any improvement.
City Construction Projects
Greenwood Ave, Bloomington, IN 47401, USA
- Case Date:
- 1/19/2023
One week ago, people were laying internet cable in our neighborhood. They left last Friday, but there are still sizeable holes in the streets, each of which is an injury and lawsuit waiting to happen. My yard has a hole in the grass and a pile of dirt. There are no covers for these holes, and they are very dangerous for kids and adults (its a walk-to-school route). This work was carried out with no notice to the households, and they left it unfinished with no safety precautions. I live at 1011 S. Greenwood Ave. This photo is of one the holes at the corner of Rose and Dexter, which I have to avoid while biking to work. It's about 10" across. Can you make sure that these holes are covered and that the dirt in my yard is cleared up? Thanks.
City Construction Projects
728 W Allen ST
- Case Date:
- 1/24/2023
Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.
City Construction Projects
323 1/2 S Lincoln ST
- Case Date:
- 1/27/2023
The signs giving instructions for the back-in parking should have the diagram (map) rotated 180 degrees. The standard for such diagrams is to have the direction of movement going UP the page, not down. Also, the parking spaces are shown on the right side of the diagram; it looks like you are instructed to front into spaces on the right (the small arrows pointing down are hard to notice, while the up-&-right arrow is large).
City Construction Projects
- Case Date:
- 2/4/2023
317 east 3rd street
City Construction Projects
- Case Date:
- 2/11/2023
Stop light is not needed at John Hinkle and 10th per some reporter but is needed at the substantially busier and more dangerous intersection of Smith and 10th.
City Construction Projects
- Case Date:
- 3/9/2023
Several weeks ago on 8th Street in Hopewell The house in the corner had some kind of construction where the city road was tore up they have since left some of it was fixed but they're still an uneven spot on the road can we get this addressed and fixed?
City Construction Projects
1521 S Arbors LN
- Case Date:
- 3/12/2023
Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance