City Construction Projects
- Case Date:
- 4/9/2015
I have two trees in the parkway outside me home that two years ago was painted with red paint to remove. To date they are still there and the largest on with a strong wind will fall across the tree, and it is infested with bugs as well. Can someone please take a look at them. Thanks.
City Construction Projects
- Case Date:
- 2/7/2012
Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
City Construction Projects
- Case Date:
- 4/13/2012
Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction?
Thanks,
Gerry Matthews
City Construction Projects
- Case Date:
- 12/14/2021
Mike Morris (917-538-5927) called about a tree that fell on the multi-use path handrail on Rogers, just east of High. He mentioned it happened months ago and wanted to know when it will be repaired.
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
City Construction Projects
- Case Date:
- 6/14/2022
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?
City Construction Projects
- Case Date:
- 7/11/2022
In front of house 725 E Second Street is a nasty utility cut.
City Construction Projects
- Case Date:
- 8/7/2022
Call toes second and Lincoln and second and College. Popo also third and Cory.
Utility cut 914 E. Atwater has sunken
City Construction Projects
- Case Date:
- 9/7/2022
Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.
City Construction Projects
- Case Date:
- 10/5/2022
Park Ridge East's traffic calming signs acquired through HAND have been destroyed repeatedly. Greenway improvements are to take place 2024 we are told? But any shortening of that timeline would be greatly appreciated. There is high speed, cut-through traffic, and people who desperately need something more than a plastic sign to convince them to drive safely.