1700-1748 W 17th St, Bloomington, Indiana, 47404
- Case Date:
- 4/17/2019
Unsafe and hazardous conditions for pedestrians to cross the road to use the modified 2 west bus route in a low income area. Additionally line of sight issues with improper construction truck storage
City Construction Projects
1701-1715 S Walnut St, Bloomington, Indiana, 47401
- Case Date:
- 5/13/2020
Contractors working on the new entrance to Switchyard Park along South Walnut should have the right lane closed. They've got the barrels partially blocking the lane preventing cars from using it when traveling alongside another vehicle in the left lane and the contractors are actually working in the roadway. This is an unsafe scenario for the workers and drivers.
City Construction Projects
1715 E Durham Ln, Bloomington, IN 47401, USA
- Case Date:
- 5/19/2020
NEED TREES AND BRUSH CLEARED NEAR CONCRETE WALKWAY ALONG WINSLOW ROAD
City Construction Projects
1809 E Southdowns DR
- Case Date:
- 10/4/1999
STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK
City Construction Projects
1901 S Weimer RD
- Case Date:
- 6/23/1998
Ms Sudbury is unhappy with the amount of traffic that is using Wapehani Road as a
cut-through from the Wapehani Hills development.
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
1969 S Henderson ST
- Case Date:
- 4/18/1997
ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.
City Construction Projects
2-54 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 12/27/2019
Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson