City Construction Projects
700 S Walnut ST
- Case Date:
- 9/9/1996
Ms. Borhan said the City tore up her driveway approximately a year ago and promised to return landscaping and everything back to "as was". She has not had any landscaping done and there is mud at the driveway.
City Construction Projects
616 S Jordan AVE
- Case Date:
- 2/27/1998
GRAVEL AND UTILITY TRUCKS ARE LEFT ON THIS STREET WHEN THE CREW ISN'T WORKING HERE. THE GRAVEL DUST CAUSES A MESS. HER CAR IS DIRTY, AND SHE CAN'T OPEN HER WINDOWS BECAUSE IT GETS HER HOUSE DIRTY.
City Construction Projects
615 N Adams ST
- Case Date:
- 5/15/1997
8TH & ADAMS STREET REDEVELOPMENT PROJECT: HALL STATES THAT THE SIDEWALK IS SPALDING VERY BADLY. HE WOULD LIKE TO HAVE SOMEONE FROM THE CITY COME AND WALK THE SITE WITH HIM. HALL STATES THAT THIS IS "THE WORST JOB HE HAS EVER SEEN".
City Construction Projects
615 E Atwater AVE
- Case Date:
- 9/21/2001
Address approx. for entry. Street Dept. received a phone call from citizen regarding a street cut that has caved in on Atwater between fess and Henderson.
City Construction Projects
613 E 12th ST
- Case Date:
- 8/18/2024
Prior to the recent construction at this intersection, the storm sewer drains on both sides of Fess just north of 12th Street were covered with thick, fibrous mats, ostensibly to prevent gravel from washing down there during the project. Now that the construction is complete, should those mats now be removed?
City Construction Projects
608 W Wylie St, Bloomington, IN 47403, USA
- Case Date:
- 8/19/2022
Hi, I live on W Wylie Street between Rogers and Fairview, and I'm super concerned about the detour down our street. On the face of it, this seems like a good solution, because our street is one-way and there is a construction detour sign on Rogers that would route people the right way and bypass the construction on Second Street.
As a resident, I can tell you that people race down this street the wrong way *all the time*, and with the construction detour they are now racing in the opposite direction as well. This is a one-lane street with the other lane used for on-street parking. I'm waiting for a bad head-on collision. Someone drove the wrong way down Wylie going at least 40 mph while I was writing this. Thanks for listening and doing anything you can to make this safer. I know they're breaking the law, but I don't want anyone to get hurt or killed. Thank you.
City Construction Projects
600 W 6th ST
- Case Date:
- 9/12/2019
I feel like the city should know that I broke my foot walking down the horrible Near West Side sidewalk last week.
City Construction Projects
5900 N MAPLE GROVE RD
- Case Date:
- 11/8/2001
Fax was received stating that Mike and Julie Donham were upset with the final yard work at 515 S. Washington St. in Bloomington, IN. They feel add'l. topsoil and seeding are needed along sidewalk and 2 depressesions needed on south side of house.
City Construction Projects
5717 S Rogers ST
- Case Date:
- 2/24/1998
Mr. Stidd called and said that the road at 5717 S. Rogers was supposed to have been cleaned up by CBU contractor, but it is extremely dusty and dirty.
City Construction Projects
555 N Morton ST
- Case Date:
- 8/11/2015
Side walk lift (5")