City Construction Projects
2610 S Rockport RD
- Case Date:
- 8/31/1998
Mr. Turpin called and reported that when the Utilities Dept. installed new line on Rockport Road they dug up entry to his driveway. At that time the driveway had a culvert. When redoing his driveway, no culvert was installed. Water backs up in his driveway now and he has a "muddy mess." He would like a culvert installed since he is afraid his car will be damaged.
City Construction Projects
111 S ROGERS ST
- Case Date:
- 8/20/1998
Mrs. Myers called on behalf of her son, Joe Myers, because the alley-way running from Rogers St. east -west near the Rogers St. fire station needs to be paved. She wants the Street department to have more money so that they can pave her alley sooner than the fall of 1999, when Bobby Chestnut told her it would be paved.
City Construction Projects
2308 S Cutter CT
- Case Date:
- 7/8/1998
(Please call the above complainant for additional information). Says Utilities dug a hole to install a manhole and did not finish grading around it.
City Construction Projects
1901 S Weimer RD
- Case Date:
- 6/23/1998
Ms Sudbury is unhappy with the amount of traffic that is using Wapehani Road as a
cut-through from the Wapehani Hills development.
City Construction Projects
616 S Jordan AVE
- Case Date:
- 2/27/1998
GRAVEL AND UTILITY TRUCKS ARE LEFT ON THIS STREET WHEN THE CREW ISN'T WORKING HERE. THE GRAVEL DUST CAUSES A MESS. HER CAR IS DIRTY, AND SHE CAN'T OPEN HER WINDOWS BECAUSE IT GETS HER HOUSE DIRTY.
City Construction Projects
904 S Rose AVE
- Case Date:
- 12/18/1997
MOUND OF DIRT LEFT IN YARD , WOULD LIKE YARD REPAIRED
City Construction Projects
401 N Morton ST
- Case Date:
- 10/23/1997
Mr. Sutherland is frustrated and perplexed, that the City has the nerve to take on so many construction projects at one time, especially when all the students are back in town. He had to detour 4 different times just to get to work on the west side of town. He thinks this is very poor planning on the part of the City, and he'd like to know how all of this construction can be scheduled to take place at the same time?
City Construction Projects
304 N BRYAN ST
- Case Date:
- 9/10/1997
The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.
City Construction Projects
W TAPP RD
- Case Date:
- 8/20/1997
Noticed that City has blocked off the road through the medical center/COTA which was acting as an alternate route around the Tapp Road work. State is working on 37 exits for Fullerton Pike and Rockport Road and has them down to one lane. This is creating a very dangerous situation since Rockport is the official Tapp Road detour. Someone should look at this and open the road through the medical center or see if something else can be done before someone is killed.
City Construction Projects
1204 S Grant ST
- Case Date:
- 7/30/1997
Citizen objects that Utilities will only repave area torn up for water main installation. Says the work has damaged the whole street and it needs repaving. Says the front of her property has been damaged by storage & removal of gravel, etc. Wants her lawn repaired. Has spoken with Doug Jones who said Mike Farmer would call her. Has also spoken with Dana at Street.