closed #183420

City Construction Projects

2711 N Dunn ST

Case Date:
4/13/2023

Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.

closed #168401

City Construction Projects

2901 S Olcott BLVD

Case Date:
5/5/2019

2901 Olcott. Dead branches, over sidewalk and street. Hit by trucks, knocked down by storms.

closed #166580

City Construction Projects

2907 S McIntyre Dr, Bloomington, Indiana, 47403

Case Date:
11/19/2018

New Island in the middle of Tapp road just east of Kegg is not marked with any traffic cones or signs, hazardous, difficult to see

closed #164720

City Construction Projects

2911-3099 East Rogers Road

Case Date:
6/7/2018

The new sidewalks on the northwest corner of Sare and Rogers have been badly damaged from utility trucks driving on them. There could have been some plywood or metals plates used to cover the walks to protect them.

closed #180893

City Construction Projects

300 E Smith AVE

Case Date:
8/4/2022

A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.

closed #182502

City Construction Projects

301 E 19th ST

Case Date:
1/16/2023

Whenever I return home from work every night, I am always greeted by the mud from construction. Someone else has reported this issue December last year, but I don’t see any improvement.

closed #181087

City Construction Projects

301 E 20th ST

Case Date:
8/18/2022

Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?

closed #170679

City Construction Projects

301-399 S Mitchell St, Bloomington, Indiana, 47401

Case Date:
10/10/2019

Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.

closed #66506

City Construction Projects

304 N BRYAN ST

Case Date:
9/10/1997

The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.