City Construction Projects
301 E 19th ST
- Case Date:
- 1/16/2023
Whenever I return home from work every night, I am always greeted by the mud from construction. Someone else has reported this issue December last year, but I don’t see any improvement.
City Construction Projects
301 E 20th ST
- Case Date:
- 8/18/2022
Street cuts on E. 20th between N. Dunn and Lincoln are excessive and damaging tires. Please fix before more cars are damaged. Thank you!
City Construction Projects
301 E Winslow RD
- Case Date:
- 12/9/2019
The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?
City Construction Projects
301-399 S Mitchell St, Bloomington, Indiana, 47401
- Case Date:
- 10/10/2019
Was pulling to side of road to park I hit this drain. It broke the right leaf spring on my cargo trailer.
City Construction Projects
304 N BRYAN ST
- Case Date:
- 9/10/1997
The sewer in the alley behind 304 N. Bryan St. was dug up by private contractor. After the work was completed, the hole was improperly filled in, which has caused a sink hole.
City Construction Projects
304 S Rogers ST
- Case Date:
- 8/28/1997
After traffic calming device was installed at the corner of 3rd and Rogers, sidewalk had to be realigned. Realigning meant tree had to be dug up and the lawn in this area was never fixed.
See letter
City Construction Projects
305 S Lincoln ST
- Case Date:
- 6/24/2022
East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.
City Construction Projects
3073-3099 E Moores Pike, Bloomington, Indiana, 47401
- Case Date:
- 12/6/2019
Road striping/painting contractor created a major hazard and delay yesterday at E. Moores Pike/College Mall Rd/S Sare Rd.
City Construction Projects
309 N Walnut ST
- Case Date:
- 6/16/1999
sidewalk torn up in the 300 block, in front of Taco Bell (think by gas company) and was never repaired. Has been out for awhile and is a hazard to pedestrians (Carol I also think they did not repair the sidewalk next to Alice's house on Morton and 10th. You may want to address both of these walks with them)
City Construction Projects
3110 N DAVID DR
- Case Date:
- 7/12/1995