uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (242)

closed #118807

City Construction Projects

409 E Southern DR

Case Date:
8/26/1997

Ms. Costley owns the above rental property. Wants to know if the area between the street and lawn where recent work was done will be seeded and strawed. Utilities says this work was on storm sewers in conjunction with Hillside work.

closed #118910

City Construction Projects

425 E KIRKWOOD AVE

Case Date:
8/11/1997

Citizen is manager of Jiffy Treet. Says sidewalk in front of business is very bad and several older people have almost tripped. Did not realize property owner is responsible....he rents from Claire Young, 812-597-5711. JA told him we'd have Street check it out (Tom Goldman).

closed #118954

City Construction Projects

429 E Southern DR

Case Date:
7/28/1997

When sewer line was being installed, her property line was taken out, ground bulldozed, fence cut/damaged, and dog houses turned over. She wants Crider & Crider to replace fence. She has called C & C, CBU, Engineering, and Risk. SEE JANE FLEIG and/or JENNIFER LLOYD FOR FURTHER DETAILS.

closed #119217

City Construction Projects

2535 W Evergreen DR

Case Date:
6/12/1997

MR. LUCAS CALLED AND STATED THAT SEWER LINES WERE INSTALLED TWICE IN A YEAR (THE LAST BEING ABOUT 5 WEEKS AGO) AND THAT DAMAGE WAS DONE TO HIS PROPERTY AND HAS NOT YET BEEN REPAIRED.

closed #119230

City Construction Projects

524 S Lincoln ST

Case Date:
6/10/1997

Citizen says construction crew was jackhammering street at 8am at Lincoln & University, a few feet away from her (and other) car. Dust and chunks of asphalt are all over her car. She thinks that no parking signs should have been posted if they were going to work this close to cars. Street Dept. thinks this was an Indiana Gas crew.

closed #119358

City Construction Projects

2419 W Evergreen DR

Case Date:
5/19/1997

DENNIS SISCOE IS BUILDING A HOUSE AT 2419 W EVERGREEN DRIVE. APPARENTLY HE HAD TO COME ACROSS THE FRONT YARD OF MR. LUCAS' HOUSE TO HOOK ONTO THE CITY SEWER. IT HAS BEEN OVER TWO WEEKS AND THE TRENCH HAS NOT BEEN PROPERLY COVERED. THERE IS SEVERAL ROCK AND DEBRIS IN HIS YARD. HE WANTED TO KNOW IF THIS LINE HAD BEEN INSPECTED AND WHAT CAN BE DONE TO MAKE SISCOE CORRECT THIS PROBLEM. REFERRED TO THE MONROE COUNTY BUILDING DEPARTMENT.

closed #119377

City Construction Projects

615 N Adams ST

Case Date:
5/15/1997

8TH & ADAMS STREET REDEVELOPMENT PROJECT: HALL STATES THAT THE SIDEWALK IS SPALDING VERY BADLY. HE WOULD LIKE TO HAVE SOMEONE FROM THE CITY COME AND WALK THE SITE WITH HIM. HALL STATES THAT THIS IS "THE WORST JOB HE HAS EVER SEEN".

closed #128329

City Construction Projects

100-198 E Smith Ave

Case Date:
8/31/2012

It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.

closed #129266

City Construction Projects

Case Date:
10/16/2012

i noticed a very dangerous situation that needs to be fixed. on the old part of west 3rd street that is still 2 lanes, beside the cresent donut shop, it is very narrow there, & i noticed that the edge of the street there is crumbling away. when it starts snowing in a month or 2, it will be even more dangerouse, because as the snow accumulates it can form a false shelf effect. in other words, the street there could look wider than it really is, so a driver could easily go over the edge & down into a little creek under there. please fix. thank you

closed #147127

City Construction Projects

S State Road 46

Case Date:
8/9/2015

Subsidence to manhole cover in far turn lane. College mall and SR46 While on 46, turning left onto E. 3rd St. Manhole cover is tight to island divider. Next to storm drain.