closed #179583

City Construction Projects

214 E 15th ST

Case Date:
4/20/2022

Construction site utilizing alleyway creating potholes and divots

closed #179574

City Construction Projects

Case Date:
4/20/2022

The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.

closed #174600

City Construction Projects

Case Date:
1/29/2021

There is a utility cut near the intersection of E First and Henderson near #521, that has not been properly paved over. This can be a hazard to motorists' tires, since there is no warning sign at all about this cut.Especially at night not visible.

closed #173498

City Construction Projects

W Marquis DR

Case Date:
8/26/2020

Caller said that semi's are taking w 17th to N Lismore Dr to W Marquis Dr. They are getting stuck and running over curbs. Also getting stuck and N Crescent Rd onto Fountain. Wants to know why they are routing them that way.

closed #173265

City Construction Projects

Case Date:
8/5/2020

Pot hole on Rogers road by Sherwood oaks church - dangerous! People are damaging their vehicles. Needs immediate action!

closed #173069

City Construction Projects

Miller & Henderson, Bloomington, IN 47401, USA

Case Date:
7/16/2020

For weeks, the contractor doing the concrete curb work at Miller and Henderson has left a deep drop off as you head westbound on Miller to the stop sign unprotected. Of course they have plenty of barrels everywhere else where they filled in the cuts, but not at this the worst one. And every city utility worker coming to and fro from the Miller garage drives right by it.

closed #172486

City Construction Projects

1715 E Durham Ln, Bloomington, IN 47401, USA

Case Date:
5/19/2020

NEED TREES AND BRUSH CLEARED NEAR CONCRETE WALKWAY ALONG WINSLOW ROAD

closed #171454

City Construction Projects

320 W 8th ST

Case Date:
1/15/2020

7th and Union badly needs crosswalk for pedestrian and bike. Thank you!

closed #171300

City Construction Projects

2-54 E Winslow Rd, Bloomington, Indiana, 47401

Case Date:
12/27/2019

Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?