closed #186433

City Construction Projects

317 S Rogers ST

Case Date:
12/6/2023

I let you know there duke engery doing road work 321 N Rogers St Bloomington, IN 47404 United States

closed #186167

City Construction Projects

1907 S Sussex DR

Case Date:
11/1/2023

Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.

closed #183345

City Construction Projects

323 S Grant ST

Case Date:
4/5/2023

There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...

closed #183101

City Construction Projects

1521 S Arbors LN

Case Date:
3/12/2023

Moors and Clarizz, the fiber contractors left a large rectangular hole in the asphalt by the arbors entrance

closed #182597

City Construction Projects

728 W Allen ST

Case Date:
1/24/2023

Intersection of Patterson and Allen. If heading north on Patterson, there is a hump as you cross Allen street at the light. When doing 30mph(the speed limit) it's enough to upset steering and cause traction control to come on.

closed #181310

City Construction Projects

500 W Fairway LN

Case Date:
9/1/2022

New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.

closed #181013

City Construction Projects

925 E Atwater AVE

Case Date:
8/13/2022

East 914 Atwater utility cut needs filled in

closed #180893

City Construction Projects

300 E Smith AVE

Case Date:
8/4/2022

A contractor (possibly PCT?) installing a utility pole at NW corner of Lincoln and Smith is blocking the alley and blocking parking on private property.

closed #180415

City Construction Projects

305 S Lincoln ST

Case Date:
6/24/2022

East-West alley between Girls and Boys Club and the building to the north needs repaved. It is in really bad shape and dangerous.It was never repaired after work was done in it. Thank you.

closed #171172

City Construction Projects

301 E Winslow RD

Case Date:
12/9/2019

The sidewalk widening project along S. Henderson St. is extremely dangerous for pedestrians and a hazard for vehicles pulling in and out of Winslow Plaza as well. The contractor dug 2' deep x 2' footings for new curbs at the sidewalks crossing the entrances to Winslow Plaza and put up now warning signs, barricades, cones, or caution tape. No sidewalk closed signs have been put up. Who is supervising this project?