closed #132235
Traffic Related Complaints
901-921 E Atwater Ave
- Case Date:
- 6/9/2013
Street sign missing for Woodlawn at intersection with Atwater
Street sign missing for Woodlawn at intersection with Atwater
Woodburn and Grimes street sign down
Rather large pothole
With all of the construction in town and people using alternate routes it is creating nightmares for drivers as I'm sure you are aware. NOW they have the right turn lane off Smith road to 45 east closed. Traffic backs up well past the hill coming down Smith to get out onto 45 again. A couple of years they were doing something along 45 and put a 3 way stop at Smith and 45. This seriously needs done again for the ongoing construction. I'd like to see it as a permant relief for traffic issues at this much used, congested area. Thank you
Poor visibility of the "do not enter" signs where 11th st becomes one way have created a situation where multiple cars a day continue the wrong way onto eleventh. The signs are faded, and they are placed too far back over the crest of the hill. They're also partially blocked by fencing from construction. Many drivers don't realize they are going the wrong way, then continue through the intersection of 11th and Woodlawn, and through the intersection of 11th and Park traveling the wrong way. It's especially dangerous because people traveling on Woodlawn or Park don't have stop signs and won't expect drivers to come from the wrong direction.
Stop sign westbound on W. Allen St. is covered by trees, and I've seen 3 vehicles in the past week not stop, almost causing me to get in an accident.
The raised pedestrian crossings on Allen are almost invisible when driving east. Often see traffic hitting them way too fast which could cause them to lose control. Suggest painting them a brighter color.
There are several construction crews working along Atwater. There are no flaggers or safety measures in place. It is dangerous and there have been close calls for accidents.
Forgotten Street Construction Sign on Pleasant Ridge Rd (near 3rd St) from spring/summer re-paving work.