closed #140061
Potholes, Other Street Repair
320 N College AVE
- Case Date:
- 8/15/2014
Pot holes are becoming quite large in the alley on the north side of One City Centre, 120 W 7th Street. Thank you.
Pot holes are becoming quite large in the alley on the north side of One City Centre, 120 W 7th Street. Thank you.
While we do have a pothole at the edge of our driveway that extends into the culdesac and city street one which we live, I'm reporting here a request to extend the curb in the culdesac to the area in front of our house. I have sent in a few requests over the years to the City of Bloomington to get the curb extended and have never heard back. We regularly have folks parking in our yard (probably inadvertently), causing further erosion issues in our yard. Thank you.
need an accurate street sign on both ends of East Park Lane. The present sign is: "park lane". This will confuse fire trucks and ambulances. I have already experienced this. Apparently there are other Park Lanes in the City so we must distinguish East from the rest.
hole needs filled in asphalt at intersection of Morningside Drive and Park Lane.
Soil pipe has formed at corner of East Glenwood Ave and Morningside drive causing street to cave in.
This isnt a pothole as much as a man created crater at the edge of a parking lot and a dirt area. I am afraid it will begin compromising the asphalt now since it is just sitting and eroding?
A hole has developed in front of our mailbox and the edge of the street seems to be sinking into the hole.
The alleys between Madison and Rogers/Kirkwood and 6th Street are torn up again. Graffiti on the building for Car Quest which is seen from this alley already and they just painted it. Thank you!
A large pothole has formed as one turned off of 10th Street. The address it is located is 409 E 10th Street.
The construction at the corner of 11th and Walnut of the new apartment building has left this area of Walnut hazardous and capable in inflicting vehicle damage even when travelling slowing, especially the utility cut across Walnut which has not been filled in to be even with the road surface. This is the same type of problem that existed at 11th and Rogers but is horizontal across the street instead of diagonal across the intersection. The problem at 11th was fixed but this one needs attention ASAP to prevent damage to vehicles and subsequent claims to the city for that damage. There are also breaks and holes and bumps in the pavement at the crest and going down the other side towards 12th street and so on. Thank you for your always prompt and excellent responses to my reports.