Potholes, Other Street Repair
1016 E Maxwell Ln
- Case Date:
- 8/13/2025
Hi. This area of Maxwell lane needs to be built up a bit higher to help rainwater drain off into the grass. This spot retains water for many days after even a moderate rain. People like to park on the grass which is fair since it’s on the city’s right of way, but it looks bad, splashes pedestrians and bicycles and I think could be improved with a minimal amount of work. The edge of the road just needs a bit of building up so water drains properly. Thanks. Fred Pavalko
Potholes, Other Street Repair
1022 N College AVE
- Case Date:
- 8/13/2025
2 or 3 pretty big potholes on the block of 15th between Walnut and College
Potholes, Other Street Repair
1906 S Walnut St
- Case Date:
- 8/11/2025
In the southbound, left lane. Not sure if it’s a pothole or grade difference in the road but it’s going to blow my tire. It’s hard to see so I hit almost every time.
Potholes, Other Street Repair
800 E Grimes LN
- Case Date:
- 8/11/2025
Intersection S Stull Ave & E Grimes Ln 15" deep hole.
Potholes, Other Street Repair
917 E Grimes LN
- Case Date:
- 8/11/2025
Previously reported this hole. Took 6 or more weeks for someone to repair. Put asphalt on top which lasted almost 2 weeks before opening up again. 15" hole needs FILLED with dirt/gravel before asphalt
Potholes, Other Street Repair
2214 S Laurelwood CIR
- Case Date:
- 8/10/2025
Laurelwood Drive and Laurelwood Circle have not been attended to. They need a complete repaving. Potholes have not been fixed and continue to get worse. I complained about this condition several months ago. Some of the worst potholes were filled but that didn't last long. It's not just potholes; the pavement is in bad shape.
Potholes, Other Street Repair
7407 W Chafin Chapel RD
- Case Date:
- 8/10/2025
Across the street and Northeast of our driveway closer to top of hill near Tandy and Karen Circles driveway
Potholes, Other Street Repair
107 N Smith Rd
- Case Date:
- 8/10/2025
There is a spot in the street at Post Road and Meadowlark where it was cut into while the street light on the other side was installed. It was patched after the installation but now it has partially collapsed and may get worse.
Potholes, Other Street Repair
- Case Date:
- 8/9/2025
Thank you for repaving of Sixth Street from Rogers to Elm Street. But, the worst part of that street is from Elm to just beyond the roundabout at Oak Street......it is in horrible condition for cars, bicycles or pedestrians. The street truly needs repaving all the way to Adams, but at least get to Oak Street. Thank you
Potholes, Other Street Repair
- Case Date:
- 8/9/2025
on North Jackson Street, just north of 9th Street, at entrance to Rev Butler Park, there is an extensive pothole --- and others as you travel north to BLIne crossing.