Potholes, Other Street Repair
- Case Date:
- 11/2/2023
A small square of asphalt (about 1 foot by 1 foot) was cut out of the road immediately in front of our driveway at 4021 E. Morningside Drive during a repair. It was filled with gravel but has not yet been repaved so are requesting that get filled in with asphalt/pave.
Thank you.
Potholes, Other Street Repair
- Case Date:
- 2/23/2024
Adam st from Bloomfield Rd to Allen St northbound needs strip patching or what ever the Coty did to the southbound lane a couple of years ago
Potholes, Other Street Repair
- Case Date:
- 3/18/2024
There is a very deep washed out area along the eastern shoulder of S Henderson St south of Winslow Rd -- across from All American Storage. There is also some severe erosion happening on the other side of the "V" on the sides of Walnut St Pike by the Echo apartments.
Potholes, Other Street Repair
- Case Date:
- 3/21/2024
Rough temporarily paved section on heavily traveled road to North High School. Have witnessed several northbound cars swerving to southbound lane to avoid vehicle suspension damage. Accidents waiting to happen! Please finish road repair ASAP.
Potholes, Other Street Repair
- Case Date:
- 3/24/2024
Close to 610 S Pleasant Ridge on the right hand side of the incline is a filled hole that is sagging pretty badly.
Potholes, Other Street Repair
- Case Date:
- 4/17/2024
Flooding down Brownridge is starting an erosion hole again the road side with a drop of about 3 ft. from the road bed. A short load of stone (2-3 yds maybe) added to the previous should solve it; the last treatment has remained stable and has worked well.
Potholes, Other Street Repair
- Case Date:
- 4/25/2024
The utility manhole covers in the Northbouand lane of Walnut Street from Miller Drive to Grimes are below the pavement level and need to be raised to pavement lever. This condition has existed since Walnut Street was re-paved years ago. Please fix. Thank you
Potholes, Other Street Repair
- Case Date:
- 5/8/2024
The street sign at S Churchill Court has faded out completely. It needs to be replaced. Visitors have difficulty finding out home on this court.
Potholes, Other Street Repair
- Case Date:
- 5/12/2024
Could the utility cut at the intersection of Nancy Street and Mark Street on the east side be paved, please?
Thank you.
Potholes, Other Street Repair
- Case Date:
- 10/29/2020
Two potholes on N Staats drive on the eastside. Please patch as soon as possible.
Thank you