Potholes, Other Street Repair
800 N Washington ST
- Case Date:
- 8/1/2018
Last year, the section of the sidewalk at Washington and Cottage Grove was replaced, but the workers left a trench in the road that collects water and breeds mosquitos. I couldn't help but notice when similar work was done this summer on 10th street and a layer of pavement was laid alongside the sidewalk to fill the trench there. Probably just an oversight but it'd be nice to get this job completed.
Potholes, Other Street Repair
1830 W 17th ST
- Case Date:
- 7/13/2017
When does the city intend on finishing this section of road? Ever since the bridge was completed it doesn't look like any work has been done at all to finish this one bit of road at all, and it's been months! East-West traffic is already a nightmare for this county because of the construction on I-69, Second, and Third Street, and yet the one route that can really act as a good alternate route to help alleviate some of that traffic is hampered by this abandoned project. While the detours tell people to go down towards 11th Street, we all know that way too many people are cutting through the neighborhood where there are plenty of children trying to play outside. This is nothing but ridiculous!
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 11/6/2017
Utility cuts across Crescent Rd need patched & leveled or paved
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 12/1/2017
Utility cuts across N Crescent Rd have settled, they need patched & leveled or milled & paved
Potholes, Other Street Repair
1270 N Crescent RD
- Case Date:
- 12/15/2017
Utility cuts across N Crescent Road need patched & leveled
Potholes, Other Street Repair
816 E 8th ST
- Case Date:
- 4/23/2018
There is a 2 by 1 foot pothole that was intentionally dug in the alley that runs behind the property.So the pothole is between the property and the Hutton Honors College. Don't know if the city or party that dug it was looking for pipes or what, but the hole has been there for almost two weeks unfilled. There are 6 parking spots all in a row behind the property. The pothole is dug in such a way that it is directly behind a parking spot making the spot unusable.
Also, when the pothole was initially dug there was already a car in the parking spot. The pothole was dug directly behind the tires of the car making it impossible to avoid when the car backed out. May want to instruct crews or whichever party was responsible not to do that. Pothole should not be hard to spot.
Please let me know at the email address provided when to expect the pothole to be filled and if there is any other info you need
Thank You
Potholes, Other Street Repair
103 N Roosevelt ST
- Case Date:
- 5/17/2013
The area where we park on the side of the road (if coming off of 7th street heading towards 5th, on the right side) is pretty rutted up and turns into a big mud hole when it rains. It looks like it just needs more gravel.
Potholes, Other Street Repair
700 N Walnut ST
- Case Date:
- 1/7/2015
The construction at the corner of 11th and Walnut of the new apartment building has left this area of Walnut hazardous and capable in inflicting vehicle damage even when travelling slowing, especially the utility cut across Walnut which has not been filled in to be even with the road surface. This is the same type of problem that existed at 11th and Rogers but is horizontal across the street instead of diagonal across the intersection. The problem at 11th was fixed but this one needs attention ASAP to prevent damage to vehicles and subsequent claims to the city for that damage. There are also breaks and holes and bumps in the pavement at the crest and going down the other side towards 12th street and so on. Thank you for your always prompt and excellent responses to my reports.
Potholes, Other Street Repair
116 S Park Ridge Rd
- Case Date:
- 8/20/2021
Street needs repaved. Filed u-report 8/14/21 reporting same problem which was closed 8/19/21 indicating hot patch crew sent to area. Street in front of my property on west side of street and extending down to Saratoga Drive remains with areas of broken down and damaged pavement that was not hot patched. The patching is a temporary fix that does not last due to the poor drainage. The drain culvert in front of my house is filled with road debris, sand and dirt. After any significant rain, this collects water which does not drain as the culverts need repaired to allow for better drainage to the road drain near Saratoga Drive. The road slopes to the west which compounds the problem. Was told last year the issue with the water collecting in front of my house in the culvert was due to asphalt that was placed at the end of my driveway blocking the flow of the water. My driveway was replaced in March with nothing blocking the culvert now, and it continues to be an issue. I noticed the badly damaged road and culvert on Saratoga Drive was repaired thankfully. Would like to see the same kind of repair done along this area of Park Ridge Rd , however, the majority of the roads and culverts in the addition need attention.
Potholes, Other Street Repair
215 E 9th ST
- Case Date:
- 1/18/2022
Westside of 215 9th St. - is an old alley that needs repaired or closed down, we are having people park in the yards of 215 & 221 9th Street to make repairs to neighboring houses because the alley is not functional