closed #162049
Potholes, Other Street Repair
1270 N Crescent RD
- Case Date:
- 12/15/2017
Utility cuts across N Crescent Road need patched & leveled
Utility cuts across N Crescent Road need patched & leveled
Utility cuts across Crescent Rd need patched & leveled or paved
Utility cuts across N Crescent Rd have settled, they need patched & leveled or milled & paved
ATT and smithville were both doing work in the alley earlier this year. They dug a trench across the alley. They filled it in when done but now the trench is collapsing.
Street needs repaved. Filed u-report 8/14/21 reporting same problem which was closed 8/19/21 indicating hot patch crew sent to area. Street in front of my property on west side of street and extending down to Saratoga Drive remains with areas of broken down and damaged pavement that was not hot patched. The patching is a temporary fix that does not last due to the poor drainage. The drain culvert in front of my house is filled with road debris, sand and dirt. After any significant rain, this collects water which does not drain as the culverts need repaired to allow for better drainage to the road drain near Saratoga Drive. The road slopes to the west which compounds the problem. Was told last year the issue with the water collecting in front of my house in the culvert was due to asphalt that was placed at the end of my driveway blocking the flow of the water. My driveway was replaced in March with nothing blocking the culvert now, and it continues to be an issue. I noticed the badly damaged road and culvert on Saratoga Drive was repaired thankfully. Would like to see the same kind of repair done along this area of Park Ridge Rd , however, the majority of the roads and culverts in the addition need attention.
The area where we park on the side of the road (if coming off of 7th street heading towards 5th, on the right side) is pretty rutted up and turns into a big mud hole when it rains. It looks like it just needs more gravel.
Street work at the intersection of Walnut and Allen left potholes that may need to be filled in.
The brick street on Park Avenue, in between 8th and 9th Streets, was torn up by the construction crews when they built the new Fiji house. They completed the work a while ago, but the street is still in awful shape. There are ruts everywhere, and a huge hole just south of 9th street. The bricks need to be replaced on this whole block.
why has thr center line not been painted on morton? the paving has been done for a long time
The subsiding utility cut at the intersection of S Eastside Drive and University is getting worse every day.