closed #179621
Potholes, Other Street Repair
- Case Date:
- 4/23/2022
The parking stripes on South Dunn are no longer visible between the 1200-1400 blocks. Can these please be repainted? This will help improve parking on the street. Thank you.
The parking stripes on South Dunn are no longer visible between the 1200-1400 blocks. Can these please be repainted? This will help improve parking on the street. Thank you.
I made the mistake of driving down 14th St at the new development today when I saw it was open. I cannot believe that the city allows something like this to exist! I have never seen a road in such bad condition within the city and it is upsetting that we continue to allow this to happen.
Westside of 215 9th St. - is an old alley that needs repaired or closed down, we are having people park in the yards of 215 & 221 9th Street to make repairs to neighboring houses because the alley is not functional
The work going on with utility poles from 17th & Rogers intersection to the Arlington roundabout is often dangerous for traffic. Local businesses are still open since they cut off the intersection itself and adjacent neighbors need access. Basically no street striping is present there’s random marks on one side that would be too tight of a lane, in addition to a partially ground up area of previous striping that still has a lot present and reflectors. The whole road needs redone. When is the projected finish of the utility pole relocation? This is a HUGE hazard.
Please remove the two piles of extra concrete that were left on either side of the new water garden the city installed in front of my house at 510 W Allen St. These are eyesores and are left over from the construction.
The company installing fiber optic broadband destroyed part of the road in our cul-de-sac, busted a water pipe, and left the road in pretty bad shape. This is a flooding hazard and has damaged the aesthetics of the neighborhood as well.
"Road Construction Ahead" sign is still at 206/208 South Clark St. even though the work on East Third appears to be finished.
ATT and smithville were both doing work in the alley earlier this year. They dug a trench across the alley. They filled it in when done but now the trench is collapsing.
The pavement is rough in the right turn lane from West Allen St onto South Larkspur Lane. I reported this on 5/6/2021 (https://bloomington.in.gov/crm/tickets/view?ticket_id=175697). The ticket was closed because “Crews were in your area 5-10-21.” However, there were no repairs done, so I’m reporting it again.
overgrown plants here make it difficult for people turning out of catalent/w hillside to see traffic on rogers