Potholes, Other Street Repair
- Case Date:
- 6/9/2021
Just checking in on closed case, thank you. Could sure use some asphalt thrown down if delay in paving Pickwick will be long.
#175370
Potholes, Other Street Repair:
Other: As rain come downhill on the street, it sometimes overwhelms our drainage tunnel. Over the years this created a line of crumble in Pickwick, in the last two years this has become a serious hazard for bicycles, pedestrians and not too good for our cars. Is there a chance we could get some blacktop put down on this? I'll be taking bids to resurface my driveway this summer, and it would be best if the street was repaired before this work gets done. Thank you! Jim Murray 1306 S Pickwick Pl Bloomington, IN 47401 812-339-8876 (home) 812-345-5513 (mobile) jmurray@iu.edu
Assigned to
Danna Workman
Attachments
See all thumbnails
4/8/2021
606f27210dde8 4/8/2021
Most tickets of this type should be closed within 7 days, although some cases may be longer. 0 days have already passed.
History
4/8/2021 13:48:09 Closed by Chris Axsom
Jim, thank you for your Ureport. Pickwick is on the schedule to be repaving tentatively in May.
Sent notification to Danna Workman, Anonymous
4/8/2021 12:36:49 Danna Workman commented on this case.
Supervisor will check into your concern.
Sent notification to Danna Workman, Anonymous
4/8/2021 11:54:08 Anonymous assigned this case to Danna Workman
Sent notification to Danna Workman, Anonymous
4/8/2021 11:54:08 Opened by Anonymous
1306 S Pickwick PL
Potholes, Other Street Repair
- Case Date:
- 6/10/2021
Pothole in the east bound lane in front of Bloomington Hospital on W Second Street, heading towards College,
Potholes, Other Street Repair
- Case Date:
- 7/30/2021
Nasty pothole in the 300 block of Kingston Drive. It is south of the turn for Chick-Fil-A.
Potholes, Other Street Repair
- Case Date:
- 8/3/2021
Number of deep and dangerous potholes along the northern edge of the public right of way. Cars are bottoming out.
Potholes, Other Street Repair
- Case Date:
- 8/4/2021
Is there reimbursement for pothole damage?
Potholes, Other Street Repair
- Case Date:
- 10/19/2021
On the north side of the newly-paved 7th Street, between Dunn and College Avenues, there are numerous locations where sewer and water drain covers are sinking into the ground...it is excessively bumpy, hazardous and only going to get worse unless addressed immediately.
Potholes, Other Street Repair
- Case Date:
- 11/28/2021
Two tires popped on right side of car due to road construction near Da Vinci
Potholes, Other Street Repair
- Case Date:
- 3/1/2017
2 utility cuts urgently need paving. the first one is on E Second, between Anita and Rose. 2 cuts next to each other. A nasty surprise for unsuspecting motorists.
The second one is on E First, between Grant and Lincoln. It is the whole width of the street.
Potholes, Other Street Repair
- Case Date:
- 3/7/2017
After the heavy rain, the 'usual' potholes have appeared again on the south side of e Second Street, from the intersection with High all the way until the STOP-sign at the intersection of Second and Woodcrest.
Potholes, Other Street Repair
- Case Date:
- 4/11/2017
The city was out filling pot holes on Azalea and in Summerwood Court yesterday and today. This is constantly occuring because the Summit Apartment Complex is directing run off water down onto Azalea. There is a buried system that releases water close to the street. In the winter time, this is quite dangerous because it creates frequent icing near the traffic slowing area. This area is unkept and a blight on our neighborhood. The problem in Summerwood Court is that there was orriginally a storm drain grate that was filled in many years ago. A sink hole has opened up in the neighbor's yard where it used to be. This hole poses a danger. It is in line with the location of the constant patching a few feet into the yard.