Potholes, Other Street Repair
1115 S Walnut ST
- Case Date:
- 6/1/2019
There are some growing potholes on Grimes a little bit east of Walnut (east of the gas station). The pot holes have been growing lately and are in the west bound lane.
Potholes, Other Street Repair
1307 1/2 S Walnut ST
- Case Date:
- 9/20/2019
north south alley between Driscoll and wilson. walnut and washington. full of pot holes.
Potholes, Other Street Repair
107 E Grimes LN
- Case Date:
- 11/6/2019
There is a huge pothole on the right side (north side) of the westbound lane of Grimes between Washington and Walnut, to the east of the gas station. It is getting bigger by the day and needs some help before it swallows a cyclist.
Potholes, Other Street Repair
1004 S Grant ST
- Case Date:
- 1/15/2020
There is a huge pothole on Woodlawn (northbound) at the stop sign between E 2nd St and E Hunter Ave. There are also smaller potholes along Woodlawn Ave (northbound) near this area.
Potholes, Other Street Repair
1004 S Grant ST
- Case Date:
- 1/15/2020
The street on E Cedarwood Circle between E Cedarwood Dr and Claybridge Dr need to be repaved. The road is worn below the curb and causes a large drop when backing out of driveways and makes mailboxes difficult to access.
Potholes, Other Street Repair
1311 S Dunn ST
- Case Date:
- 3/27/2020
potholes need repaired/filled
Potholes, Other Street Repair
1215 S Grant ST
- Case Date:
- 6/4/2020
Street crumbling badly at corner or Grant and Driscoll near stop sign
Potholes, Other Street Repair
211 E Grimes LN
- Case Date:
- 6/15/2020
Large pothole needs filled on East Grimes Lane. Right by 210 East Grimes Lane.
Potholes, Other Street Repair
1401 S Dunn ST
- Case Date:
- 7/27/2020
Street lamp was backed into on the corner of SE Wilson and Dunn. Needs immediate attention. Lamp is slanted. Wires may be broken.
Potholes, Other Street Repair
1009 S Grant ST
- Case Date:
- 9/1/2020
Two manhole covers on Sassafras Hill Apartment complex (managed by Hunter Bloomington Properties) have been damaged for over 6 months. As you can see, the damage is quite severe. Rather than fix the issue, HBP has relied on traffic cones/barrels to block traffic from riding over the defective manholes.