Potholes, Other Street Repair
800 N Washington ST
- Case Date:
- 8/1/2018
Last year, the section of the sidewalk at Washington and Cottage Grove was replaced, but the workers left a trench in the road that collects water and breeds mosquitos. I couldn't help but notice when similar work was done this summer on 10th street and a layer of pavement was laid alongside the sidewalk to fill the trench there. Probably just an oversight but it'd be nice to get this job completed.
Potholes, Other Street Repair
225 N Washington ST
- Case Date:
- 10/5/2018
There is mud all the way down the alley that is being tracked by foot traffic and vehicles. The mud is being tracked into the Cantol Wax building by the residents. It is also being tracked onto the city sidewalks leaving the alley due to Miller Pipeline working on the gas lines in the alley. 211 N Washington St
Potholes, Other Street Repair
501 N Morton ST
- Case Date:
- 11/27/2018
Not a huge deal but tiny bit of overlay appeared gapped in front of evolve on 17th
Potholes, Other Street Repair
527 N Lincoln ST
- Case Date:
- 12/17/2018
Nasty utility cut near 711 and 714 on E First. No warning sign or nothing.
Potholes, Other Street Repair
605 N Fairview ST
- Case Date:
- 3/2/2019
The small stub of West 10th Street that runs West from Fairview to another short street called Curve Street and runs for one block is a disgusting muddy mess. If you are not going to maintain this street why don't you dig it up and turn it into green space? During the recent rains the City storm water system was so backed up in this location that the entire area completely filled with water (causing water infiltration into the basement of the house I own at 605 North Fairview. The storm sewers are often blocked and the culvert at the bottom of the park is inadequate to handle the water that runs off Ernest Butler Park. The whole situaiton is a mess and largely caused by City mismanagement. Additionally, the City has repeatedly allowed Mr. Goodman to violate City rules and codes and directives and his mess and non-running cars adds to the mix of this mess--once again a case of City mismanagement. This horrible situation has persisted for years. As the owner of 605 N Fairview I am seriously considering hiring an attorney and taking formal legal action against the City for its inattention to its own rules. If the Goodman property were a rental property that I owned I would be getting a complaint notice every other day. Both Matt Murphy (who owns the commercial property which adjoins my house at 605 N Fairview) and I have invested significant money in keeping our properties nice and generally contributing to the uplift of the Near-Westside. Too bad the City is not helping us! My number is 812-322-2050 and I would be interested in hearing if anyone at the City has viewed the situation on this one block section of West 10th Street.
Potholes, Other Street Repair
1830 W 17th ST
- Case Date:
- 7/13/2017
When does the city intend on finishing this section of road? Ever since the bridge was completed it doesn't look like any work has been done at all to finish this one bit of road at all, and it's been months! East-West traffic is already a nightmare for this county because of the construction on I-69, Second, and Third Street, and yet the one route that can really act as a good alternate route to help alleviate some of that traffic is hampered by this abandoned project. While the detours tell people to go down towards 11th Street, we all know that way too many people are cutting through the neighborhood where there are plenty of children trying to play outside. This is nothing but ridiculous!
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 11/6/2017
Utility cuts across Crescent Rd need patched & leveled or paved
Potholes, Other Street Repair
1218 N Crescent RD
- Case Date:
- 12/1/2017
Utility cuts across N Crescent Rd have settled, they need patched & leveled or milled & paved
Potholes, Other Street Repair
1270 N Crescent RD
- Case Date:
- 12/15/2017
Utility cuts across N Crescent Road need patched & leveled
Potholes, Other Street Repair
816 E 8th ST
- Case Date:
- 4/23/2018
There is a 2 by 1 foot pothole that was intentionally dug in the alley that runs behind the property.So the pothole is between the property and the Hutton Honors College. Don't know if the city or party that dug it was looking for pipes or what, but the hole has been there for almost two weeks unfilled. There are 6 parking spots all in a row behind the property. The pothole is dug in such a way that it is directly behind a parking spot making the spot unusable.
Also, when the pothole was initially dug there was already a car in the parking spot. The pothole was dug directly behind the tires of the car making it impossible to avoid when the car backed out. May want to instruct crews or whichever party was responsible not to do that. Pothole should not be hard to spot.
Please let me know at the email address provided when to expect the pothole to be filled and if there is any other info you need
Thank You