Potholes, Other Street Repair
207 S College AVE
- Case Date:
- 10/16/2024
Earth-shattering, teeth-breaking, dinosaur and world ending sized crater IN College Ave turn lane right before 3rd St. Bloomington could film a whole scene for a WWII movie with GI’s hiding in this massive intention in the earth as they gather the courage to make the final press up the beach. The next moon landing could be faked nearby. Elon Musk may even send a rocket to this location as Mars exploration training. And as much money as all these would bring to the city, i’m really just mostly concerned about not bending the rim of my car. Thanks in advance! Live long and prosper.
Potholes, Other Street Repair
207 S College AVE
- Case Date:
- 10/16/2024
Earth-shattering, teeth-breaking, dinosaur and world ending sized crater IN College Ave turn lane right before 3rd St. Bloomington could film a whole scene for a WWII movie with GI’s hiding in this massive intention in the earth as they gather the courage to make the final press up the beach. The next moon landing could be faked nearby. Elon Musk may even send a rocket to this location as Mars exploration training. And as much money as all these would bring to the city, i’m really just mostly concerned about not bending the rim of my car. Thanks in advance! Live long and prosper.
Potholes, Other Street Repair
904 W 4th ST
- Case Date:
- 10/16/2024
I'd like to submit a request to have the alley beside my house repaved. The alley is half gravel and half paved, which has been patched multiple times. It has large potholes and is very rough and bumpy from the patching. It's the alley off of 4th St between Waldron and Rose Hill cemetery. Thank you for your time and consideration.
Potholes, Other Street Repair
401 N Morton ST
- Case Date:
- 10/15/2024
There is a new big pothole made by Gigabit on Eagleson at 2nd street. They didn’t come close to adequately filling the large hole they made. It is especially problematic at night as it can’t be seen.
Potholes, Other Street Repair
622 W 6th ST
- Case Date:
- 10/14/2024
This hole next to the street is about 3’ deep and has been there for at least three months. It needs to be fill
Potholes, Other Street Repair
1010 W Briarcliff DR
- Case Date:
- 10/14/2024
I hope this message finds you well. I am writing to inquire about the timeline for repaving the damaged section of Briarcliff Drive along the bus route. The condition of the road has deteriorated significantly, affecting both traffic safety and the comfort of public transit users.
Could you please provide an update on when repairs are scheduled? Your attention to this matter would be greatly appreciated by the community.
Thank you for your assistance.
Potholes, Other Street Repair
800 N Grant ST
- Case Date:
- 10/13/2024
Street markings need repainted
Potholes, Other Street Repair
611 W 11th ST
- Case Date:
- 10/8/2024
Pothole endangering downhill cyclists
Potholes, Other Street Repair
1506 N Washington ST
- Case Date:
- 10/6/2024
Many potholes
Potholes, Other Street Repair
515 E 10th ST
- Case Date:
- 10/5/2024
Could we repaint the wait stop lines at the 10th and Indiana intersection? I drive bus in town and to make most turns at this intersection stopped cars for the light which is right the need to stop could way back. Line is there but with winter coming i would feel safer if it had good coat on new paint. Thank You