closed #160390
Potholes, Other Street Repair
101-159 North Lincoln Street
- Case Date:
- 8/2/2017
Esan Thai lot paved; contractor made a mess on the alley & parking lot
Esan Thai lot paved; contractor made a mess on the alley & parking lot
dangerous hole in asphalt
Sinkhole forming near storm sewer drain.
Subsiding (Vectren?) utility cut on the south side near the east end of E First Street near the intersection with Jordan.
why has thr center line not been painted on morton? the paving has been done for a long time
Potholes at 2706 E Hemlock Circle
Street work at the intersection of Walnut and Allen left potholes that may need to be filled in.
The pavement on Washington Street behind the recently completed Chocolate Moose Building is in really bad shape. It is kind of filled in but not level with old pavement and has lots of gashes in it. The bike lane there is especially bad. The new pavement south of 2nd street is great, especially where the cars are on the left side.
I respectfully request that you paint crosswalks at the corners of Daniel and Forrestor and David and Forrestor in the Hyde Park neighborhood. We used to have crosswalks, but they were covered over on those three corners during recent paving and need to be repainted. Many people cut through the neighborhood on those streets and often roll through the stop signs. The Crosswalk will make it safer for the children and others who cross those streets on the way to Schmalz Park. Thank you for considering this request. Have a wonderful autumn.
Storm drainage system on N Blair needs concrete repaired before winter. Ends if metal grating are exposed and may catch on snow plows