open #208463
Potholes, Other Street Repair
1921 W Allen ST
- Case Date:
- 2/7/2026
Potholes on Allen st from Bloomfield rd to Adams st
Potholes on Allen st from Bloomfield rd to Adams st
Just a heads up. East Dodds is in need of repaving. I have lived here for 46 years and can only recall it being paved one time. And then it was not the whole street. Patching is not holding because the street is crumbling. It is particularly severe on intersecting street on the south of Dodds. And after this winter I can only imagine how bad it will be. Thank you.
Pothole in the middle of the crosswalk outside of Child’s elementary school on south high street.
There is a hole in the alleyway that causes a significant risk to pedestrians. This is just near the sidewalk area and pedestrian entrance to the 4th Street Parking garage. We have placed our own cones near the hole to try to protect folks, but the cones have been moved several times for cars to use the alley. This is an immediate hazard that needs to be fixed ASAP. Thanks, Brian
I’m reaching out regarding our driveway connecting to the street. The surface is extremely rough and there is a pretty big gap. It has gotten bad enough to the point it’s damaging the front bumper of my car when I back out. If someone could come out and take a look to repair it, that would be amazing. Thank you
A large orange END CONSTRUCTION sign with yellow lights that blink at night has been abandoned on the green space in front of our home. The home across the street also has a sign with a blinking light. Please remove and reuse where needed.
Red car leaking gas onto road in front of abandoned house
repairs on grimes here are poorly done and rougher than the potholes they filled
I had sent in a request on 5/19/25 Case #202787 reporting that Olive Street needs a concrete curb installed. Due to the excessive rainfall this has caused flooding issues for 1502 S. Olive and the house on the corner of Hillside and Olive (1144 E. Hillside Dr.). I was informed that this was on the paving list and there was plans for an asphalt curb. I called on 6/9/25 and spoke to the Engineering dept. (Iris) about installing a concrete curb instead of asphalt. There is already a partial concrete curb that runs past 1502. It needs to have a concrete curb all the way up the hill so that rain will not flood into the driveway and along the house of 1502, plus it runs past the curb into the yard of 1144 E. Hillside causing flooding in the basement. They have a sump pump now, but it's old and could quit at any time. It's already August and there hasn't been any kind of activity on this street. Do you have an estimated date as to when the street will be paved and the curb installed? Also, there is a construction sign in the yard of 1144 E. Hillside that has been there all summer and would like it to be moved. Thank you for any information you can provide!
Thanks to the Zach Sowders crew for making Adams St between 7th and the Bline a safer and more appealing thorough fare.