open #187735
Potholes, Other Street Repair
739 N Oolitic DR
- Case Date:
- 3/21/2024
There is a massive trench across the full width of N Oolitic Drive. It has gotten terrible and I fear is a safety risk. It has been there since at least August 2023.
There is a massive trench across the full width of N Oolitic Drive. It has gotten terrible and I fear is a safety risk. It has been there since at least August 2023.
Approximately 30 yards eastward from the stop sign at E Post Road and N Staats St, in the westbound lane of Post road, is a 12" wide by 33" long rectangular indentation originally dug by a contractor and then filled in. The fill has since subsided by one to two inches throughout. Hope it can be topped off to make a smoother street.
On N. Oolitic near 11th St there is a deep cut in the road where I assume utility work was done but the cut is dangerous as it will destroy a car. There is no sign to alert a car that it is there, and it needs to be filled in or a metal sheet needs to be placed over it until the complete repair can be done. I thought my tires were going to blow out yesterday when I drove over it and I drove very slowly over it because I was aware already that it was there. Please stop ignoring the road conditions around here (Lindbergh and Oolitic between 11th and 17th) and please fix them asap.
this washed out patch is a fairly serious safety issue for cars and pedestrians. Due to recent work on a sidewalk on Clover Lane, orange traffic cones were available, and were placed at the site of the hole to reduce the risk of an accident. City personnel came to see the issue, and took away the traffic cones, thereby increasing the risk of an accident. City personnel informed me that the hole would be repaired "soon" by the fiber optics installation contractor. While I understand that this sort of thing takes some time to coordinate and complete, the removal of the orange cone and the lack of a repair, is creating a safety risk for cars and pedestrians in the area. thanks, kelly
a hole in the road
"Road Construction Ahead" sign is still at 206/208 South Clark St. even though the work on East Third appears to be finished.
Attn. Street Dept. Need trailhead caution yellow marking to delineate area for no parking so the path is not blocked by parked cars or scooters. Parking in this area occurs often and is a hazard to trail users as well as ADA compliance concern for wheelchair residents and park visitors. Thanks for your follow up.
I made the mistake of driving down 14th St at the new development today when I saw it was open. I cannot believe that the city allows something like this to exist! I have never seen a road in such bad condition within the city and it is upsetting that we continue to allow this to happen.
Westside of 215 9th St. - is an old alley that needs repaired or closed down, we are having people park in the yards of 215 & 221 9th Street to make repairs to neighboring houses because the alley is not functional
The street is torn up across Grant and has been for months. Since bikes cannot travel on Lincoln, many use Grant as an alternative. Going across the ripped up pavement as you head across 3rd St is uncomfortable on a bike, especially when trying to quickly cross Third. I hope there are plans to repair this section soon to make travel easier for all modes of transportation.