Sidewalk & Curb Complaints
2003 S High ST
- Case Date:
- 8/16/2021
It has been 11 weeks since Millstone tore out my driveway and the sidwalk. It is still an awful mess. 3 weeks ago I got a notice from them that they would be replacing my driveway “this week”. It is still a terrible, muddy mess that struggle to drive through. No progress on the driveways anywhere in 6 days. FFS WHEN is this going to be completed? I want my damned driveway back. It’s almost September.
Sidewalk & Curb Complaints
2020 E Arden DR
- Case Date:
- 11/2/2021
There are two signs that were blocking the sidewalk all summer saying that the sidewalk ahead was closed for construction. They never served any useful purpose and the construction has been done for weeks. Someone moved them onto the grass, but they should be taken away because you can still bump your head on them.
Sidewalk & Curb Complaints
209 S Dunn ST
- Case Date:
- 7/11/2017
There is no paved sidewalk; it's just a bunch of horribly laid slabs of stone. How was this even allowed, especially in downtown?! This is not wheelchair accessible, and is dangerous to all others.
Please put in a paved sidewalk here so wheelchaired people don't have to turn around and cross the street just to get by.
Sidewalk & Curb Complaints
209 S Dunn ST
- Case Date:
- 3/27/2021
This “historic fieldstone sidewalk” is a TOTAL DISASTER to actually walk on. My teenage son walks, but has limited mobility and requires support to stay upright. This sidewalk was completely unsafe for him to use. We had to cross mid-block on Dunn (also not very safe) to a usable sidewalk on the west side of the street. This may be “historic” but it is NOT ADA compliant. Please make this sidewalk safe for all to use.
Sidewalk & Curb Complaints
2105 E Arden DR
- Case Date:
- 1/15/2022
While constructing the Bike Path on the portion of E. Arden Drive to SE Park, crews did not remove the heavy mats blocking storm drains at the corners of S. Williams, Greenfield & Sycamore Courts. When heavy rains appear, water flows into E. Arden Drive, oftentimes ponding in low lying areas. People often drive too fast on that street, causing hazardous driving conditions should they loose control of their car.
Sidewalk & Curb Complaints
2105 E Queens WAY
- Case Date:
- 8/22/2021
FINSISH THIS PRJECT
Sidewalk & Curb Complaints
2110 S High ST
- Case Date:
- 6/2/2021
So my driveway and the sidewalk has been completely gone for a month now, without any notice from the city. Progress... It has been replaced with loose gravel, a mess of heavy equipment traffic, and ... nothing for many weeks now. My wife cannot drive her small car over this mess without bottoming out. I haven't been able to drive my motorcycle over this mess because it's too soft for a full touring bike. The contractors spend all their time making an even bigger mess of soft gravel. Mayor Hamilton: when will you make this virue signaling mess a priority? I want my front yard back. I want my driveway back. I want my sidewalk back. FINISH IT SOON.
Sidewalk & Curb Complaints
227 E Winslow RD
- Case Date:
- 9/19/2018
I would like to request a sidewalk ramp / crossing be installed at the SE corner of Walnut St Pike and Winslow. It looks like there has previously been an accident there and now there is a concrete barricade and guard rail preventing the pedestrians from crossing. So either the pedestrian has to make a somewhat dangerous crossing there, or cross three extra times to go around and back. Thank you!
Michelle Giansante
Sidewalk & Curb Complaints
2453-2499 South Henderson Street
- Case Date:
- 9/25/2017
Damaged guardrail on culvert side of street. Can be seen from google maps. I first reported this situation last summer (2016) and was advised city was awaiting contract and materials. I reported it because I feel it could become a safety hazard during the winter months with slick and icy streets.
Sidewalk & Curb Complaints
2487 S Brittany LN
- Case Date:
- 9/1/2020
The sidewalk contruction on E Winslow Rd has been going on since winter. The project has more says with no one working on it than working on it. today I saw only 4 men on the whole project and none of them were doing any work at 11 AM. Lots of road projects in Bloomington are started and then left abandoned for months. As a resident I don't like this. If they start something they ought to work on it till finished then move on. Im frustrated with the disruption that has been going on for 7 months for a very small project.