closed #182453
Other
2552 E 8th ST
- Case Date:
- 1/10/2023
The hole that a contractor dug to install the fiber in November 2022 is caving in across my driveway.
The hole that a contractor dug to install the fiber in November 2022 is caving in across my driveway.
I am unsure this is a city issue, there is was looks like a n old landline access panel or junction box on 5th st. that is next to the road (maybe in ROW) that is unlocked and now open. See the picture.
Shed on property has been built 3.5 feet from the property line instead of required 5 feet. Also lots of grass and weed overgrowth between shed and fence.