uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (131)

closed #165452

Trails

1616 S Henderson ST

Case Date:
8/10/2018

A garbage can and plastic dog poop bag dispenser is needed at the East end of the B-Link trail.

closed #166269

Trails

3854 S Mill Stone CT

Case Date:
10/21/2018

The bike path along Sare Road south of the intersection with Olcott is rapidly deteriorating due to continuous water flow over the path that washes dirt, branches and rocks onto the path. Something needs to be done to divert this water away from the path. In the winter the water freezes, leaving the path coated with a sheet of ice. Very dangerous for bikes and pedestrians.

closed #166271

Trails

1702 S Springhouse DR

Case Date:
10/21/2018

There is a tree down across the Renwick trail that runs from Moore's Pike to Sare Rd. It is closer to the Moore's Pike end of the trail.

closed #163015

Trails

2603 S Madison ST

Case Date:
2/9/2018

Vehicle blockers broken on Ralston b-line spur on Ralston at both Madison and Bryan streets. Also there is still ice and snow on the b-line spur in the same location.

closed #163385

Trails

3115 E Stratum WAY

Case Date:
3/5/2018

Latimer woods trail has a tree dropping dangerously large limbs onto the trail. Taking the trail clockwise, the tree is on the left just past the footbridge.

closed #159405

Trails

2801 W Timbers TRL

Case Date:
5/31/2017

There was bad storm that started about 11:30pm May 10th. The storm knocked down a huge tree in the wooded area next to my apartment. The tree was knocked down into the trail that runs around Twin Lakes so there is no access through anymore.

closed #153716

Trails

1099 E Winslow RD

Case Date:
6/23/2016

there are trees blocking the way all along this trail

closed #135284

Trails

1000 S Henderson ST

Case Date:
11/18/2013

Tree down on Bryan Park trail neR bathroom.

closed #135370

Trails

2750 S Wexley RD

Case Date:
11/22/2013

Down tree blocking path

closed #142297

Trails

2750 S Wexley RD

Case Date:
11/10/2014

There has been some construction on the trails near the Wesley Sports complex. I use the trail to commute to work by bike every day and noted its bad constitution - especially after heavy rain. I had hope for some improvements but the 'closed for construction' signs have been removed and while the trail is now wider it seems like the construction has been stopped half way. The trail is still very sandy / muddy and parts are very soft so that my bike sinks into the sandy surface which makes it very uncomfortable to rise and also somewhat unsafe. Is the construction already done or just paused?