- Case Date:
- 7/30/2014
There is a VERY large and odd bulge in the metal framework of the B-line Trail's Grimes Street bridge. It is visible on the bridge, on the right hand side (east side), as one passes northward. Seems to be a significant structural defect.
- Case Date:
- 8/1/2014
Trail between the Winslow park & recreation and High Street. Poses hazards to people who are physically handicapped and blind.
- Case Date:
- 8/1/2014
Trail with roots. Please remove or build a small bridge over them. Thanks.
- Case Date:
- 8/1/2014
Trails in the Winslow area are only meant for 1 person and the vegetation is overgrown. Please allow for 2 people to walk along together in comfort.
- Case Date:
- 8/1/2014
Erosion control needed. Please make the Winslow trails cement or asphalt. Thanks.
- Case Date:
- 8/1/2014
Many of the trees have limbs that are quite low, even for a 6-foot tall person. Please trim the trees
- Case Date:
- 8/3/2014
B-line trail has several areas where the trail bulges up. Between light posts 6 and 7.
Trails
N Glenwood Avenue West
- Case Date:
- 8/13/2014
Hello, while biking on the Park Ridge Bike Trail (which leads under the bypass), I've noticed a lot of construction in that area. Specifically, I've noticed that gravel is being laid along the tracks, and was wondering if a trail is being put in there? Perhaps one that leads to Park Ridge East Park?! I really hope that's it, but thought I would check. Thank you!
Trails
Bloomington Rail Trail
- Case Date:
- 8/19/2014
New LED light out at B-line trail and West Allen intersection
Trails
Bloomington Rail Trail
- Case Date:
- 8/19/2014
New LED light out at B-line trail and West Allen intersection