- Case Date:
- 4/25/2021
Old 37 & n walnut. The ped xing across walnut (part of the cascades trail that connects to griffy) is still / again broken. I stayed for five minutes, pushed the beg buttons lots of times, tried both directions. Always the red hand, never the white walk. The intersection is cycling normally and promptly for cars. The crossing of old 37 appears to be operating in ped recall mode (ie, working), though its countdown timer is misconfigured. But the high-stress crossing of walnut is versnickered. I get sick when i think how many millions of dollars we've spent on this recreational facility to still have this gap in the most dangerous part.
- Case Date:
- 4/28/2021
Winslow Woods has neighbors, on west side, that are clear cutting the woods (fresh stumps) behind their(?) homes, also they are leaving large brush piles of yard waste. They are making trails and lining them with cut trees.
- Case Date:
- 5/20/2021
Almost run over by bikes while walking in Cascades
- Case Date:
- 5/20/2021
Hi. I already sent this in, but I didn’t know how this form worked. Anyway, I LOVE that the road in Cadcades is closed for pedestrians. I think it is GREAT and might revitalize that park. But, when I was walkng there yesterday, a pack of racing bicyclists (think Little 500 pratice) came screaming around a corner, directly into where we were walkng and suddenly they were screaming “people! people!” and whooshing around us. It really felt like they could have hit us and we could have been really hurt. They were going very fast and there were about 15 of them. The road in Cascades is not safe as a pedestrian walkway if that continues. It really worries me.
- Case Date:
- 5/24/2021
Clear Creek trail, 1? mile south of Tapp, water fountain is taped up. It really would be good to get it going again, as is a needed water stop between Tapp and the Sheriff's substation further south.
- Case Date:
- 6/3/2021
Resident reported a tree down on Clear Creek path "just past little animal farm off Rockport Road."
- Case Date:
- 6/17/2021
Please improve the east morningside greenway with calming of vehicular traffic
- Case Date:
- 6/20/2021
Tree down completely blocking B-Line Trail just northwest of where it crosses Moravec Way. I ran this route yesterday afternoon after the storm and the trail was clear at that time, so it happened sometime between yesterday late afternoon and this morning.
- Case Date:
- 6/30/2021
Several areas of this trail are overgrown making it difficult to walk let alone bike.
- Case Date:
- 7/6/2021
I'm very excited to see the new High Street multi path finally being developed, however I do have 2 concerns about the project.
First, access for our Sycamore Knolls neighborhood into the Jackson Creek Trail has been effectively cut off during construction, and there is really no safe way to bike to the trail with small children unless you ride on High Street. Better consideration should have been given to maintain pedestrian access after removing the existing sidewalk on High Street.
Second, it is disappointing that the trail will end at Arden. It would have been nice to see in continue north for another half mile to Marilyn/Covenanter, and connect into the existing Covenanter Greenway. That would have greatly expanding access for the Southeast side of town towards the B-Line trail utilizing this existing greenway.