uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (45)

closed #185662

Utilities Construction

Case Date:
9/19/2023

Cbu replaced 3 hydrants during main replacement. These areas need to be replanted . Additionally during one replacement irrigation damage resulted in a $400 charge for repair. We request reimbursement

open #185582

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
9/14/2023

Gigabit or AES or their contractors are installing fiber optic cable or something such as that. Will they be repairing all the grass from the holes and tracks from the heavy equipment?

closed #185376

Utilities Construction

Case Date:
9/1/2023

The company, installing fiber optic cables on my St., South, Lori Lane, destroyed my drainage that goes underneath my driveway. We are in a flood zone, and if this isn’t corrected my driveway, which is gravel, will wash away. I’m really shocked how careless the company was in excavating my property without fixing it. My house is at 80 S. Lori Ln.

closed #183614

Utilities Construction

1709 E Circle DR

Case Date:
4/27/2023

Water near hydrant all the time. Either slow leak or natural spring?

open #182511

Utilities Construction

1020 S Woodlawn Ave, Bloomington, IN 47401, USA

Case Date:
1/17/2023

From Reddit Bloomington: Fiber cables damaging sewer lines We live right next to Bryan Park. About a week ago our toilet backed up, and after multiple visits from our (very honest and reasonable) plumber, we discovered that the city's fiber optic internet contractor had carelessly run an optic cable directly through our sewer line. This caused a ton of debris to get into our drain pipe and completely clog the pipe, necessitating a $10k repair. I called the city and apparently, this is happening to people all over town. (The person in the utilities office said I was the third person to call today with this exact problem, and our plumber said that this contractor got thrown out of Carmel for damaging so many sewer lines).

closed #182260

Utilities Construction

Case Date:
12/13/2022

We will not use garbage collection service for several months, but City will still charge us for the service unprovided, only because your billing system was set up that way. Is this legal to charge residents for the service you are not providing ? Sounds ridiculous and illegal. Hope Mr. Mayor could see to it and step in for a immediate correction. Thank you.

open #182248

Utilities Construction

1205 S Collinswood DR

Case Date:
12/10/2022

My water is off. There has been work in the area, but no communication about it. No work occurring today. I am quite disturbed that it appears I might be without water for a while with no information about it.

open #182111

Utilities Construction

Bloomington, IN, USA

Case Date:
11/19/2022

It is sinking and needs cleaned.

closed #181772

Utilities Construction

510 1/2 E Mulberry St, Bloomington, IL 61701, USA

Case Date:
10/10/2022

I would like to know when the barrier and repair of water turn off in from of my house will be repaired. It has been several years and thereis a big hole in the area with a barrier, however, I hope no one falls in it. I think it is time to repair or whatever you are going to do with the hold. it has been years now

closed #180521

Utilities Construction

Case Date:
7/5/2022

Smithville is installing lines in my neighborhood. The road itself is narrow and for most of tosd, parking is allowed only on one side. The contractor ignores the no parking signs. They park large pieces of equipment illegally over night ehen they could park legally. They have also blocked us in by having equipment in the middle of the road with the other end closed. I understand that they need to have equipment where it is needed when they are working in the day, but not at night