closed #188872
Utilities Construction
406 E 12th ST
- Case Date:
- 6/10/2024
There is a "CBU" orange/white-striped horse-type warning sign sitting by the street (12th Street side) that has been there awhile without any apparent reason.
There is a "CBU" orange/white-striped horse-type warning sign sitting by the street (12th Street side) that has been there awhile without any apparent reason.
There was a utility project in the Spicewood subdivision over the winter. The streets through the neighborhood have been severely damaged. I looked on the city paving schedule and did not see a project listed to fix the damage that was caused by the project. Is the city coming back to fix the roads? It's huge eyesore and really poor patching jobs for the damage that was done.
The cover of our water meter on the sidewalk is loose and poses a risk for tripping, strollers, wheelchairs etc
The cover of our water meter on the sidewalk is loose and poses a risk for tripping, strollers, wheelchairs etc
Could the city please finish the water project started during the winter? I scrap my car every time I come out of my driveway. The patch jobs were terrible on all parts of the Spicewood neighborhood.
Hole in utility lid with no meter. All other lids on this street have smart meters so I just want to make sure this one wasn’t vandalized
Hello, There has been utilities construction going on by our apartment for over a month now. We understand that there is a lot of noise that comes along with it, especially since they have to break through multiple feet of rock to be able to place new sewer lines. We have been understanding in the last few weeks as rock hammering began at 7AM and went on through 5PM Monday-Friday. Even as this construction extended to Saturdays as well. As of last night however, the construction went on all night long. I am guessing that since this is a city run construction project that the noise ordinance was overlooked, however with the continued rock hammering this is unacceptable. It is disruptive and prevented us from sleeping through the night (which is especially impressive given that we have grown accustomed to the street noise typical of living on Walnut Street). Again, we get that this is an important project and that there is a lot of noise that comes along with that. However work through the night cannot continue. Sincerely, Brandon Fricke
Substantial disregard for property keeps occurring with whoever is laying fiber on E. Morningside. Water main burst at 4021 E. Morningside Drive. CBU dug up my yard to do repair. Please confirm that will be fixed by CBU via spring planting season for grass, etc.? The fiber team, if you can provide me contact information for a complaint if possible, was driving their truck through my yard today again including over areas CBU dug, causing significant depressions. When called out when I went out front a few minutes ago, they asked "What damage?" before I had to point it out and they said they would fix. A truck remains driving back and forth in my front yard at present. I am tempted to call the police. They are beyond any sort of easement, which they are abusing to begin with. This is getting ridiculous.
Fire hydrant is open -- water gushing out.
Fiber install hit water line. Lots of water leaking