closed #186434

Utilities Construction

711 E Cottage Grove AVE

Case Date:
12/6/2023

SE corner of lot just west of alley and close to the sidewalk there is a medium-sized, water-meter pit that is uncovered. Lid is not around, apparently. Dangerous trip hazard at night, and animals could fall in.

closed #186541

Utilities Construction

719 W 7th ST

Case Date:
12/15/2023

They had a water line or sewer line emergency at 719 W 7th and contractors tore up a lot of sidewalk on the South Side of W 7th Street in front of the house. Who is responsible for repair or sidewalk? This happened Thursday night and continued all day Friday 12/15. Contractor was Snedegar Construction.

closed #190223

Utilities Construction

812 S Park AVE

Case Date:
7/5/2024

The cover of our water meter on the sidewalk is loose and poses a risk for tripping, strollers, wheelchairs etc

closed #187862

Utilities Construction

819 N Jackson ST

Case Date:
4/2/2024

This vault installation is not working. Location: ROW of N Jackson St, just south of the SW corner of N Jackson and W 13th. Vault installer (per plaque on the vault): Hoosier Fiber Networks. First, the pea gravel is not a great choice for fill in the ROW. I am pretty sure this is supposed to be a vegetated tree plot. Second, the fill is eroding away, leaving deep holes in the ROW. Please make Hoosier Fiber Networks fix it. Thank you!

closed #173827

Utilities Construction

Bloomington City Hall

Case Date:
9/28/2020

metal culvert st entry to parking lot has rusted out and collapsed, leaving an 18 inch hole near a fire hydrant. I talked with Ed last week. my phone is 812 325 5968

closed #189981

Utilities Construction

Spicewood Ln

Case Date:
7/3/2024

There was a utility project in the Spicewood subdivision over the winter. The streets through the neighborhood have been severely damaged. I looked on the city paving schedule and did not see a project listed to fix the damage that was caused by the project. Is the city coming back to fix the roads? It's huge eyesore and really poor patching jobs for the damage that was done.

closed #179588

Utilities Construction

Case Date:
4/21/2022

Water leak in city water line pre meter

closed #180521

Utilities Construction

Case Date:
7/5/2022

Smithville is installing lines in my neighborhood. The road itself is narrow and for most of tosd, parking is allowed only on one side. The contractor ignores the no parking signs. They park large pieces of equipment illegally over night ehen they could park legally. They have also blocked us in by having equipment in the middle of the road with the other end closed. I understand that they need to have equipment where it is needed when they are working in the day, but not at night

closed #182260

Utilities Construction

Case Date:
12/13/2022

We will not use garbage collection service for several months, but City will still charge us for the service unprovided, only because your billing system was set up that way. Is this legal to charge residents for the service you are not providing ? Sounds ridiculous and illegal. Hope Mr. Mayor could see to it and step in for a immediate correction. Thank you.

closed #184316

Utilities Construction

Case Date:
6/24/2023

water meter cover (??) missing on sidewalk on the west side of college, just north of the train bridge (about a block south of 14th st). trip hazard. not sure if it was removed for construction or what but it's been gone for about a month. thanks!