open #185582

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
9/14/2023

Gigabit or AES or their contractors are installing fiber optic cable or something such as that. Will they be repairing all the grass from the holes and tracks from the heavy equipment?

open #185872

Utilities Construction

S Mill Stone Way, Bloomington, IN 47401, USA

Case Date:
10/4/2023

Gigabit or Giga-something installed fiber optics in the neighborhood. The holes they dug in the grass were not repaired. After advising them of the situation they came out to "repair" the grass. The soil was filled with rocks and gravel. There were no grass seeds in the soil. I spent a whole day picking rocks and gravel out of the soil, buying top soil, and grassseed to fix this. The ground is no longer level and there's also rather gouges or chunks in sidewalks and curbs. The road had preexisting, but plugged pot holes near the Sare entrance, but now those potholes are open again and expanding.

closed #189981

Utilities Construction

Spicewood Ln

Case Date:
7/3/2024

There was a utility project in the Spicewood subdivision over the winter. The streets through the neighborhood have been severely damaged. I looked on the city paving schedule and did not see a project listed to fix the damage that was caused by the project. Is the city coming back to fix the roads? It's huge eyesore and really poor patching jobs for the damage that was done.

closed #179588

Utilities Construction

Case Date:
4/21/2022

Water leak in city water line pre meter

closed #180521

Utilities Construction

Case Date:
7/5/2022

Smithville is installing lines in my neighborhood. The road itself is narrow and for most of tosd, parking is allowed only on one side. The contractor ignores the no parking signs. They park large pieces of equipment illegally over night ehen they could park legally. They have also blocked us in by having equipment in the middle of the road with the other end closed. I understand that they need to have equipment where it is needed when they are working in the day, but not at night

closed #182260

Utilities Construction

Case Date:
12/13/2022

We will not use garbage collection service for several months, but City will still charge us for the service unprovided, only because your billing system was set up that way. Is this legal to charge residents for the service you are not providing ? Sounds ridiculous and illegal. Hope Mr. Mayor could see to it and step in for a immediate correction. Thank you.

closed #184316

Utilities Construction

Case Date:
6/24/2023

water meter cover (??) missing on sidewalk on the west side of college, just north of the train bridge (about a block south of 14th st). trip hazard. not sure if it was removed for construction or what but it's been gone for about a month. thanks!

closed #185376

Utilities Construction

Case Date:
9/1/2023

The company, installing fiber optic cables on my St., South, Lori Lane, destroyed my drainage that goes underneath my driveway. We are in a flood zone, and if this isn’t corrected my driveway, which is gravel, will wash away. I’m really shocked how careless the company was in excavating my property without fixing it. My house is at 80 S. Lori Ln.

closed #185662

Utilities Construction

Case Date:
9/19/2023

Cbu replaced 3 hydrants during main replacement. These areas need to be replanted . Additionally during one replacement irrigation damage resulted in a $400 charge for repair. We request reimbursement

closed #166172

Utilities Construction

Case Date:
10/9/2018

Habitat for Humanity of Monroe County is working at the SE corner of 17th and Fee on the IU campus. The attached picture shows a water outlet cover that is broken.