Utilities Construction
6000 S Handy RD
- Case Date:
- 8/29/2013
On 08/28/13, I asked CBU field inspector, Mike Runyon, to inspect the site. He did and reported that the area was restored properly and that adding soil and filling in the area requested by the homeowner would create a drainage issue.
Utilities Construction
444 S Patterson DR
- Case Date:
- 8/9/2013
Sewer back up
Utilities Construction
2655 S Sunflower DR
- Case Date:
- 8/9/2013
Storm ditch behind customers property is washing away
Utilities Construction
2800 E Buick Cadillac BLVD
- Case Date:
- 8/13/2013
Hole is developing above storm drain pipe
Utilities Construction
3246 S Coppertree DR
- Case Date:
- 8/15/2013
Customer wanted supervisor to call her, she has a question RE: project on coppertree drive
Utilities Construction
6000 S Handy RD
- Case Date:
- 8/28/2013
Received voice message from James Eller, owner and resident of 6000 S. Handy Rd. Mr. Eller alleges that settlement occurred to his yard as a result of CBU's water transmission main project.
Utilities Construction
1900 E Atwater AVE
- Case Date:
- 10/15/2013
Neighbors storm pipe is drianing into customers easement into her back yard. CBU customer
Utilities Construction
700 E Winslow Farm DR
- Case Date:
- 11/5/2013
says her HOA is planning to remove a retention pond behind her house and install a water garden, she does not want this to happen.
Utilities Construction
2231 S Fairmount CT
- Case Date:
- 11/12/2013
water running out of her yard, down sidewalk to sewer drain.
Utilities Construction
3413 S Glasgow CIR
- Case Date:
- 11/15/2013
VB OR METER LID NEEDS RAISED