Biking & Walking
1415 E 3rd ST
- Case Date:
- 1/11/2017
On March 2, 2016, I submitted a question about the lack of painted crosswalks for pedestrians crossing 3rd Street at Jordan Avenue. I received a prompt reply from Matt Smethurst, saying that the intersection would be torn up soon for stormwater improvements, and the crosswalks would be completed after that. There was indeed work completed over the summer, and the curbs now look very nice, but almost a year after my original question, there are still no crosswalks painted in the street. Are they going to appear sometime?
Biking & Walking
1419 S Sare RD
- Case Date:
- 5/19/2023
The side path along the west side of South Sare from E Moores Pike to E Cathcart is about half blocked at multiple points by trees and shrubs. Have seen people step into roadway to avoid other path users.
Biking & Walking
1462–1596 W Tapp Rd
- Case Date:
- 5/20/2013
The mini sidewalk that runs parallel to the road has vegetation that constrains its use.
Is it possible to have someone run a mower or a weed eater next to the sidewalk to remove the vegetation that falls onto the walkway.
Thank you as always.
Biking & Walking
149 S Kingston Dr
- Case Date:
- 8/14/2024
New construction at the new sporting store has blocked the bicycle lane.
Biking & Walking
1501 S Walnut ST
- Case Date:
- 2/14/2022
The pedestrian crossing signal button to walk from East to West across S Walnut St does not work. The one on the south East corner. I've tested it a few times in the late afternoon and waited through several full traffic light cycles. The pedestrian crossing buttons on the other corners and directions do work.
Biking & Walking
1501-1505 South Olive Street
- Case Date:
- 3/27/2017
The transition from Hillside onto South Olive street is rather rough, as there is a bump up as you make the turn. On a bike this is unexpected, and a bit rough at best. Given that this is a signed bike route, could this transition be leveled out?
Biking & Walking
1501-1645 West 3rd Street
- Case Date:
- 1/24/2017
Bikes lanes near the patterson point construction are covered in rocks and other construction debris, most the rocks are big enough to pose a serious hazard to cycists
Biking & Walking
1502 S Hathaway CT
- Case Date:
- 3/23/2021
Have reported this before, never got an answer. I was told it was something to do with the city and guard rail study. The trail at this location is below the grade of the road on Moores Pike. I requested evaluation for a guard rail to protect walkers from a car leaving the road and rolling over the hill. This is a high speed road and it is very unnerving to walk along this trail. Send someone out and stand there to see what I mean.
Biking & Walking
1502 S Hathaway CT
- Case Date:
- 3/2/2022
The sidewalk / side path that runs through the South East park near the tennis courts is substantially below grade of the adjacent Moores Pike roadway. I walk through here on a daily basis, often with small children, and it feels a bit dangerous when cars are zooming by. Has the city considered a guardrail or other physical separation here?
Biking & Walking
1507 W 11th ST
- Case Date:
- 12/20/2019
I apologize..I'm not sure I picked the right category. I would like to request a crosswalk at 11th and Walnut..across walnut. The bus stops there and let's large groups of students off that then cross, going west. After dark, I'm worried someone will get hit especially.
Thanks in advance.
Susan Hingle