Sidewalk Requests
102 E Ridgeview DR
- Case Date:
- 11/30/2021
There is a need for sidewalk on the east side of S Walnut street between E Winslow Rd and E Ridgeview Dr. It's a very dangerous stretch where motorists tend to speed and includes a blind hill. There are pedestrians walking along the shoulder of this road constantly. Thank you for your time.
Sidewalk Requests
1321 S Washington ST
- Case Date:
- 5/15/2024
The sidewalk is covered in mud and becomes hazardous when wet.
Sidewalk Requests
1365 S Stella DR
- Case Date:
- 5/27/2023
Sidewalk on Smith is being encroached upon by undergrowth
Sidewalk Requests
1609 S Rogers ST
- Case Date:
- 1/18/2024
I would love to see a proper crosswalk and sidewalks added at all sides of the Rogers and Rockport intersection. I would also like to request a completed sidewalk added to the east side of Rogers between Rockport and the Switchyard Park entrance. Families from Rockport Hills and the surrounding neighborhoods often walk over to Switchyard Park and I personally have had and witnessed numerous close calls attempting to cross Rogers to enter Switchyard Park on foot. It would be great to have some sort of crosswalk added at the Switchyard entrance to aid those on foot trying to cross Rogers and enter the park. During larger events when the park parking lot fills up, there is overflow parking in the field in front of Catalent. Then a huge flow of people are forced to wait for traffic in order to essentially jaywalk into the park. It seems to me that some infrastructure improvements are needed for this area of Rogers St. to facilitate the main entrance to one of the largest parks in the city. Finally, I think it would be great to have some sort of high retaining wall built around the massive eye-sore electrical transfer station directly across from the park entrance (similar to the one built right next to the Upland Woodshop). Thank you for your time and consideration!
Sidewalk Requests
1901 E Ruby LN
- Case Date:
- 9/13/2023
There is one block of Ruby Ln (my block) with no sidewalk. Please consider converting the huge culvert that runs along the S side of Ruby from Nancy to High into a storm drain, and putting a sidewalk over the drain.
Sidewalk Requests
1935 E 2nd ST
- Case Date:
- 8/12/2022
Will the improvements to E 2nd Street include installing sidewalk to fill the gap between 1935 E 2nd and 2000 E 2nd Street? This gap is a barrier to accessibility for pedestrians on this street.
Sidewalk Requests
2000 E 2nd ST
- Case Date:
- 8/18/2022
It is great to see that Public Works is currently installing ADA-compliant ramps between E 2nd Street and High Street. Is it also part of ADA compliance to complete the missing sidewalk to the west of 2000 E 2nd St?
Sidewalk Requests
2116 S Susie ST
- Case Date:
- 10/11/2020
There's a precarious dropoff (7-8') into the drainage creek just a few feet away (east) from the sidewalk on RCA Park Drive just north of Countryside, and a few yards into Susie Street. A barrier of some sort to provide added safety would be advisable.
Thanks!
Sidewalk Requests
2305 S Boulder CT
- Case Date:
- 9/26/2023
Street tree in danger of lifting up sidewalk
Sidewalk Requests
2435 E Cathcart ST
- Case Date:
- 7/20/2022
We live in Renwick neighborhood. A house was built on 2435 Cathcart St. The sidewalk needs connected or installed from 2435 Cathcart St. to 2425 Cathcart St. There is a green space between the two homes and the sidewalk needs to be completed for safety reasons. When walking on the sidewalk, it ends and you have to go out in the street. The sidewalk needs to be installed so it continues.