3746 E Villa Glen CT
- Case Date:
- 6/9/2020
Sidewalk is blocked by overgrowth of shrubs. A great amount of pruning is needed.
Sidewalk is blocked by overgrowth of shrubs. A great amount of pruning is needed.
The south end of the sidewalk in phase 2 near the gazebo is sinking. There is at least 20 inches of no dirt below the sidewalk, hence it is sinking. The sidewalk is next to the sewer drain where the earth has disappeared and with all of the water problems we have had recently with water mains, the city needs to come inspect. One city worked thought this drain runs right next to departed neighbor Cassie Howard's condo which then should worry us as the ground beneath her condo also disappeared causing her slab to sink and foundation to go bad. These two problems could be connected and the area below the sidewalk cannot simply be filled in with dirt. It has to be inspected including a city inspection. We need to see why it is all sinking.
High lip where brick sidewalk and curb cut meet prevent wheelchair user from getting safely to a bus stop
There's a precarious dropoff (7-8') into the drainage creek just a few feet away (east) from the sidewalk on RCA Park Drive just north of Countryside, and a few yards into Susie Street. A barrier of some sort to provide added safety would be advisable. Thanks!
The sidewalk on both side of our driveway have become a major trip hazard with about a 5 or 6 inch drop. We have small children that have tripped and fallen due to the root system of the trees that have caused the sidewalk to raise and crack. Additionally, small animals seem to make their way under the sidewalk.
There is a need for sidewalk on the east side of S Walnut street between E Winslow Rd and E Ridgeview Dr. It's a very dangerous stretch where motorists tend to speed and includes a blind hill. There are pedestrians walking along the shoulder of this road constantly. Thank you for your time.
On the east side of S. Walnut Pike north of Rhorer Rd there is no sidewalk between the newly installed county walk (as part of the intersection improvement) and the Peppergrass development. The bank along the road in the area is steep requiring one to walk in the street where the visibility is not great.
We live in Renwick neighborhood. A house was built on 2435 Cathcart St. The sidewalk needs connected or installed from 2435 Cathcart St. to 2425 Cathcart St. There is a green space between the two homes and the sidewalk needs to be completed for safety reasons. When walking on the sidewalk, it ends and you have to go out in the street. The sidewalk needs to be installed so it continues.
Will the improvements to E 2nd Street include installing sidewalk to fill the gap between 1935 E 2nd and 2000 E 2nd Street? This gap is a barrier to accessibility for pedestrians on this street.
It is great to see that Public Works is currently installing ADA-compliant ramps between E 2nd Street and High Street. Is it also part of ADA compliance to complete the missing sidewalk to the west of 2000 E 2nd St?