closed #176783
Blocked Sidewalk
3007 N Ramble RD W
- Case Date:
- 7/30/2021
Bushes block sidewalk, have to walk in street.
Bushes block sidewalk, have to walk in street.
Can a long term project of connecting a walking path between eastern heights and park ridge east be done for kids to walk to University elementary? Much safer than Smith. Good for environment and neighborhood connections. Would be awesome. Please consider a single connecting sidewalk. The neighborhood associations would be happy to help in any way we can.
Hi! Filing as a resident. The people who live at 508 N Adam’s have been blocking the easement that runs between their propert and the tow lot, connecting Alexander St. To the B-Line. Last time I asked about this access point, I believe COB was planning to put a sidewalk in. The pile blocking the easement has grown since I took the attached. Thank you!
Car parked on sidewalk and blocking ADA ramp. On northeast corner of 3rd and Lincoln
There is a sidewalk here that connects Meadowbrook to Fenbrook. At the top by Meadowbrook it is overgrown with poison ivy and other ground plants, narrowing the useable path by several feet. Given that it is also a blind corner this increases the danger of collisions with cyclists etc
THERE ARE 14 BIRD SCOOTERS BLOCKING THE OAKLAWN SIDEWALK SINCE THURSDAY AT APPROXIMATELY 5000 OAKLAWN CIRCLE 47401
Vegetation blocking sidewalk just north of bus stop
A big limb of a tree in the yard of 1219 E Maxwell Ln. is partially broken and draping over the side walk in front of the house next door. It’s blocking said sidewalk, and could hit people if they happened to pass under the limb when it completely breaks off from the tree.
Cars have been blocking the sidewalk and some times all the way to the street for six weeks. This was taken around 9 AM this morning
Hello! The path for students to walk to/from school is not safe. The crossguard cannot help students cross at High and Greenbriar AND navigate around the closed sidewalk. The gravel/dirt path needs to be completed ASAP so students, parents, staff, and other residents can walk safely. My assumption is that path cannot be complete until the electrical lines in front of 2102 High Street are relocated. If this is the case, please let me know who I can contact about relocating the electrical lines so the path can be paved and this project can be wrapped up. We were told the path would be complete by the start of the school year and are becoming increasingly frustrated with the unsafe environment.