Utility Construction Projects
2200 E Moores Pike, Bloomington, IN 47401, USA
- Case Date:
- 8/18/2022
AT&T lines need to be resupported. They were sagging and a truck snagged them. It broke a power pole that Duke replaced but the AT&T lines are just temporarily tied up. The whole line is a mess from High Street east with broken poles and sagging lines.
Utility Construction Projects
3304 E Winston ST
- Case Date:
- 8/12/2022
AT&T left large holes in ground after installing high speed internet.
Utility Construction Projects
3857 S Mill Stone WAY
- Case Date:
- 7/11/2022
2 things: (1) large city tree at SE corner of Sare and Mill Stone Way severely damaged, broken and dangling branches causing hazard for drivers -dangerous, needs immediate attention; (2) damage caused by water main being hit during Smithville contractor work, the same corner is in disarray, lawns torn up, streets are a mess, and city drain affected.
Utility Construction Projects
316 E Cottage Grove AVE
- Case Date:
- 5/14/2022
Att box knocke I
Br
Utility Construction Projects
- Case Date:
- 4/21/2022
The electrical poll is damaged and looks to be falling.The poll is on Hillside Drive Bloomington Indiana.
Utility Construction Projects
E Winslow Farm Dr, Bloomington, IN 47401, USA
- Case Date:
- 4/13/2022
Reported by Joanne Freeman to me. Unfinished AT&T fiber project started last summer has left exposed conduit, foot-deep holes and sand fill in rights of way (meaning grass doesn't grow). She wants City inspectors to contact Michael or Sharon Dalton who are the property managers for the subdivision to get this situation addressed. AT&T has been unresponsive to neighborhood contact. Pegasus contact info is (812) 824-3239 and pegasus.properties.gmail.com. They can provide more detailed information.