Utility Construction Projects
4295 N. Kinser Pike
- Case Date:
- 6/1/2026
Near the middle of May, Bloomington experienced several days of heavy rain. I understand that there were many problems around town. One of many near my house involved the flooding of Kinser Pike due to intense sheet runoff from the under-construction development, Kinser Ridge. Kinser Ridge had a silt fence up, but the runoff breached it. The muddy water flowed downslope through my neighbor's garage, yard shed, and driveway, and through the farm field to the north. This amounted to so much water that the culvert under Kinser Pike could not hold it, and the silty water flowed over Kinser Pike. The water pooled in the road for several hours. This was a problem worthy of a uReport. However, my actual gripe today is that the developer has not attempted to repair the damage or reinstall the silt fence. Now, when it rains again, the silty water will flow again with no impediment because the soil is now at the top of the broken-down silk fence. Behind my property line is disturbed bare soil that eroded into my yard last time, and because no effort has been made to fix it, the mud from the soil erosion will again bury my grass and trench out my garden. The bottom line is that I would like the developer to remediate the erosion problems in the northeast corner of the development before it rains again. P.S. They have had acres of bare soil uncovered for about a month. Isn't that prohibited?
Utility Construction Projects
101 S Roosevelt ST
- Case Date:
- 5/2/2026
The city has marked for a pipe installation project adjacent to my address on East Fifth Street and the man who mows my yard mowed over the flags that mark the gas pipeline and water hook up lines. They will need to be marked again before the project can begin.
Utility Construction Projects
720 W 3rd ST
- Case Date:
- 5/4/2025
Gigabtye Contracted companies placed these while laying lines but have not returned to address their lack of filling in the side. This one just a great example but many if not all are this bad. Easy to fall into or wreck your bike if you don’t see the ruts on all sides. Especially for those of us who walk/ride at night. Where’s the oversight if any? Please fix these.
Utility Construction Projects
2919 N Bankers DR
- Case Date:
- 3/13/2025
Duke Energy has refused to remove a large orange cable that is down on the length of my property (3/4 of an acre). They say someone else needs to take care of it, like maybe a cable company. I am concerned that it is dangerous to kids in my neighborhood and I cannot do yard work around it. Moreover, it is in the utility easement. They said to pick it up and see if it is attached to the utility line and I am unwilling to do that because it seems risky. In any case, no utility should be leaving their waste on my property and they should take responsibility for removing it safely.
Utility Construction Projects
823 N Dunn ST
- Case Date:
- 3/11/2025
Cylindrical hole about 4" radius drilled into street by fiber-optic workers and left unfilled. Dangerous area because there are no sidewalks along at that location, so people are forced to walk on the street. Hole is closest to SW corner of intersection. Ankle-breaker!
Utility Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 2/26/2025
Fiber-optic people bored a hole through the street, then filled it up with gravel instead of asphalt. Now, the gravel has washed away and there is a hole that someone could step in and trip. It is close to the scooter corral on the SW corner of Grant/Cottage Grove.
Utility Construction Projects
455 N College AVE
- Case Date:
- 11/27/2024
The City of Bloomington was doing road construction repairs outside of my building and broke my light pole and never came back to replace or repair!
Utility Construction Projects
1330 N Crescent RD
- Case Date:
- 11/18/2024
about a 10" inch wide hole that's over a foot deep right in the middle of 17th street. I phoned this into 911 10/20/2024, but nothing has been done.
Utility Construction Projects
615 N Washington ST
- Case Date:
- 11/10/2024
Fiber co. Cut sidewalk. Someone came to patch with asphalt. Asphalt sunk immediately. Looks like a significant hole in sidewalk. Water meter appears to be affected as well - tilting towards the hole (did not use to).
Utility Construction Projects
622 W 6th ST
- Case Date:
- 10/14/2024
This hole next to the street is about 3’ deep and has been there for at least three months. It needs to be filled