Potholes, Other Street Repair
4301-4499 S Rogers St
- Case Date:
- 4/17/2012
There are several new potholes that have opened up in both the east and westbound lanes of Gordon Pike just east of the intersection with S. Rogers. There is a particularly deep one in the eastbound lane just before you cross over the crosswalk for the b-line trail.
Potholes, Other Street Repair
- Case Date:
- 4/26/2012
There are two large potholes on Hawthorne between Third St. and Atwater.
- Case Date:
- 4/27/2012
Hi,
Not exactly a line of sight issue, couldn't really find a related category.
East Miller Drive is posted 'No Parking' from Walnut Street to Highland
Avenue, but not the last section between Highland and Maxwell. I believe
it used to be posted there also, but a few years ago the signs were
removed during construction and never reinstalled. Can those signs be
replaced or am I misremembering their existence?
Potholes, Other Street Repair
- Case Date:
- 4/30/2012
Intersection of Westminster and Westminster Way West. Large potholes and flooding EVERYTIME it rains. Asphalt disintegrating. Notified through website last year following a tow and service of auto required because of existing problems. Also, HOA has inquired, but to no avail. Handicap cannot use this sidewalk nor can they cross road.
Traffic Signals
2850 E Buick Cadillac BLVD
- Case Date:
- 5/17/2018
The crosswalk at this intersection is not cycling to "pedestrian walk", despite having the buttons being pressed.
This started happening 3 days ago before construction started in the area.
Since this is by a large complex by a busy road, I would really appreciate if you could fix this issue soon!
Thanks!
- Case Date:
- 5/17/2018
Lights out st 3rd and Rogers
Street Lights
1210 W 8th ST
- Case Date:
- 5/17/2018
Street light on south side of cul-de-sac is out.
- Case Date:
- 5/18/2018
west 3rd Ave.
I total understand that road construction needs to be completed and delays can be expected. However, the traffic pattern on west 3rd over 37 is unacceptable. I live of Johnson Drive (a few blocks east of the intersection) and I can't even get home without be blocked by traffic for 25 to 30 minutes. The construction company seems to have enough paved space now to keep 2 east/west bound lanes open and keep the traffic flow going. They need to re strip the lanes and/or have police direct traffic. There are only 2 fully operational overpasses on 37 which would be fullerton way south or 46 up north squeezing all the traffic on to 2nd/3rd which are both restricted in lanes. As I said, delays can be expected with construction but the times are unacceptable.
Potholes, Other Street Repair
3430 E Covenanter DR
- Case Date:
- 5/19/2018
Potholes, Other Street Repair
3901 E Fenbrook LN
- Case Date:
- 5/19/2018