uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (145)

open #201853

Unsafe Buildings

122 N Jefferson ST

Case Date:
4/2/2025

The tree in front of the house is dead and a hazard. I tried to contact the homeowner's directly, but the phone number I had was incorrect. It fell on my house 2 years ago, it damaged their tenant's car. I'm worried that it will fall on my house again and may injure someone. This tree needs to be removed.

open #202747

Unsafe Buildings

101 S Jefferson ST

Case Date:
5/17/2025

Attempted occasional renovation work at 101 S Jefferson St is leaving the structure open for weeks at a time. There is clear line of sight from 5th street into the main structure. I believe there is a permit displayed. The climbing vines are covering the openings faster than the construction crew.

open #203064

Excessive Growth

2128 E 5th ST

Case Date:
5/31/2025

Approximate location. Poison Hemlock in ROW, infringing upon the asphalt. There is no room for a pedestrian to step out off the road without getting tangled up in the brush. No picture this time. Chronic issue in this location.

open #203063

Excessive Growth

126 S Roosevelt ST

Case Date:
5/31/2025

Poison hemlock infestation along the 4th St walking path between S. Jefferson and S. Roosevelt St in Green acres. This is not the only location of such an infestation of this poisonous invasive in Green Acres. There is also a tree of heaven established here. Lack of maintenance is chronic in this location. In general, lack of maintenance enforcement per city code of ROW and Utility Easements in Green Acres is, in my humble opinion, the reason that those of us who try to maintain our lawns, gardens, and outdoor living spaces, are in a constant losing battle against these invasive species. Sigh.

closed #128072

Biking & Walking

2548 E Eastgate LN

Case Date:
8/21/2012

the Polly Grimshaw trail is in its usual state of near impassability. The limbs down, overhanging branches and vines, weeds and dead plant trash in the R-O-W all serve to make the way at best hazardous, at worst downright dangerous. I'm not asking you folks to maintain this east side artery to the same standards that you use for the Monon Railroad trail, but. Especially nowadays when it's more dangerous to ride to campus than ever from the east due to continuous construction, Please pay a little attention to this path. Thank You for your assistance with this situation.

closed #131053

Potholes, Other Street Repair

308 N Overhill DR

Case Date:
3/24/2013

There is a cut in the concrete on the E 7th St sidepath (near bypass underpass) that is 1 - 1.5 inches deep. It is jarring to ride over on a bike and may be a tripping hazard for pedestrians.

closed #131851

Potholes, Other Street Repair

103 N Roosevelt ST

Case Date:
5/17/2013

The area where we park on the side of the road (if coming off of 7th street heading towards 5th, on the right side) is pretty rutted up and turns into a big mud hole when it rains. It looks like it just needs more gravel.

closed #133439

Street Lights

103 S Clark ST

Case Date:
8/16/2013

The street light is out

closed #133620

Blocked Street

106 S Bryan AVE

Case Date:
8/24/2013

Alley between Union and Bryan, just north of 5th is barely passable in a small passenger car due to vehicles poorly parked in the alley. One of the vehicles is a yellow VW Bug.

closed #127168

Traffic Related Complaints

2548 E Eastgate LN

Case Date:
7/10/2012

The construction plan and closures are ridiculous. We get no notice of any road closures and we now have one way in and out of our apartment complex, which leads to a congested one lane road. We received no notice of any road closures which included our side of 45/46 and Pete Ellis. How am I supposed to get to work on time when you change the roads and lights during rush hour traffic which causes major traffic jams. The overall thought and planning put into all road construction in Bloomington is abysmal. If giving notice of road closures is too difficult to do then try to focus on completing the construction on one road before starting construction on another.